BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and addition to an educational facility in Splendora, Texas. Completed plans call for the addition of a two-story above grade educational facility; for the demolition of a educational facility; and for site work for a educational facility.

2 story; 35,589 SF addition. To include: academic buildings, re-design of the internal courtyard, site improvements, and the demolition and re-construction of a bus drive. Divisions 2 - 33 THERE ARE PHASES THAT NEED TO BE CONSIDERED. The Project consists of a third addition to the existing Splendora High School. Includes a 35,589 SF, 2-Story building, a re-designed internal courtyard, and site improvements. Scope of Work includes but it is not limited to: Selective Demolition, Concrete, Masonry, Structural Steel, Steel Joist, CFMF, Miscellaneous Steel, Rough Carpentry, Millwork, Insulation, Waterproofing, TPO Roof, Fireproofing, Metal Panels, Expansion Joints, Metal Doors, Wood Doors, Aluminum Storefront, Glazing, Frames, Door Hardware, Gypsum Board, ACT, Flooring, Sealed Concrete, Visual Displays, Signage, Fire Extinguishers, Shelving, Blinds, Fire Sprinkler, Plumbing, HVAC, Electrical, Low Voltage, Communications, Fire Alarm, Access Control, Intrusion System, Earthwork, Landscape, Irrigation, Fencing, Striping, and Utilities. Unit Prices: Please provide, look at Subcategories for Each Unit Price. Alternates: please provide to bid date. This Addendum is generally separated into sections for convenience; however, all contractors, subcontractors, material suppliers and other involved parties shall be responsible for reading the entire Addendum. Failure to list an item(s) in all affected sections of this Addendum does not relieve any party affected from performing per instructions, provided the information is set forth one time anywhere in the Addendum. This document shall become attached to and part of the Construction Documents for the aforementioned project. Proposal RFI's should be made directly to the responsible party / consultant, with copy to the Architect: 1. Arch./General: Stantec Chris Hopkins, AIA chris.hopkins@stantec.com 2 Arch./General: Stantec Matt Gvist matthew.gvist@stantec.com The Project consists of the third addition to the existing Splendora high school. The projects consist of a two-story academic building as well as re-design of the internal courtyard. These items are shown on the Contract Documents prepared by STANTEC and consultants. Question Deadline 01/31/2024 **C.A. Walker Construction requests sub bids no later than 2:00 PM on Monday, February 12, 2024.

Post-Bid

Educational

$12,800,000.00

Public - City

Addition, Demolition, Site Work

126

29

53

2

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
67
Bidding Soon
2,809
All Active Projects
1,143
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2024

March 29, 2024

img_map_placeholder

23747 FM 2090, Splendora, TX


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.