BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 21, 2024 at 8:00 PM

Updated March 22, 2024

Site work and paving for a road / highway in Wrightsville, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Please contact the engineer directly to purchase the documents. Must be a qualified bidder with proof of a contractor license in GA to be provided these documents. The project includes the resurfacing of Lord's Pond Road beginning at State Route 15 and ending at Idylwild Rd. (0.9Mile), Re-striping Harrison Pringle Rd from US Route 319 to Cross Cedar Rd (1.3 miles), re-striping Archer Pond Road from State Route 15 to US 80 (5.75 miles), Full Depth Reclamation on Harrison Pringle Road from Cross Cedar Rd. to Johnson County Line, the removal and replacement of three (3) failing 48 corrugated metal pipes at Shepard Road at Smith Creek 2300 ft W of US-221. All work to be performed under this project must be completed within 120 consecutive calendar days following receipt of Notice to Proceed. All bids must be accompanied by a Bid Bond in an amount not less than five percent (5%) of the Base Bid. Performance Bond and Payment Bond, each in the amount of one hundred percent (100%) of the contract amount, will be required of the successful bidder. Bonds must be written by an acceptable Surety Company licensed to do business in the State of Georgia and listed in the Department of the Treasury, Circular 570, latest edition. Johnson County reserves the right to reject any or all bids, including without limitation, the right to reject any and all nonconforming, non-responsive, unbalanced or conditional bids and to reject the bid of any bidder whom the Owner believes would not be in the best interest of the Project to make an award to that bidder whether because the bid is not responsive, the bidder is unqualified, or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner.

Post-Bid

Roads / Highways

$2,000,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
44
Bidding Soon
683
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 29, 2024

May 1, 2024

Project location map

Multiple Locations, Wrightsville, GA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.