BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 29, 2026 at 8:00 PM

Updated July 8, 2026

Site work and paving for a civil project in Saint-Basile-le-Grand, Quebec. Design plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Construction of a cycle-pedestrian bridge to connect the two parts of the City separated by Sit-Wilfrid-Laurier Boulevard (Road 116) and the Canadian National Railway Company railway. The scope of work includes the construction of the bridge, development of rises and approaches, burying of electrical wires and other services. This project is a priority for the City as it will ensure the safety of active transportation, particularly between Montée Robert and Boulevard du Millénair. TIMELINE: The project of a pedestrian and cycling bridge over Sir-Wilfrid-Laurier Boulevard (Route 116) is preliminary. Following a public consultation with local population the owner has finalized the project location and completed a feasibility study. The project is temporary on hold as its implementation requires funding and authorization from the Government of Quebec and the Ministry of Transport. Timelines of further project development are not finalized. Further update in late 2026/early 2027.

Design

Bridges / Tunnels

$12,500,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
582
Active Projects
30
Bidding Soon
4,080
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 12, 2024

March 15, 2027

Project location map

QC-116, Saint-Basile-le-Grand, QC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.