EN

BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 1, 2024 at 7:00 PM

Updated March 27, 2024

Site work and paving for a mixed-use development in Waterloo, Illinois. Completed plans call for site work for a educational facility; for paving for a educational facility; road / highway; and road / highway.

Contract Documents prepared by FGM Architects Inc., 475 Regency Park, Suite 325, O'Fallon, Illinois 62269; phone 618.624.3364; fax 618.624.3369 All work associated with the District Pavement Improvements for Waterloo CUSD 5. Bids received after stated time will not be accepted and will be returned unopened. Bids will be based on a Single Lump Sum contract. Bids shall include not less than the prevailing hourly wage rate determined by the Illinois Department of Labor. Contract documents may be obtained electronically from the office of FGM Architects, 475 Regency Park, Suite 325, O'Fallon, Illinois 62269. Contact Cinnamon Covert, telephone number 618.624.3597, email cinnamoncovert@fgmarchitects.com. Bid Security is required in the amount of ten (10) percent of Proposal. The successful bidder will be required to furnish a satisfactory Performance Bond and a Labor and Material Payment Bond for the full amount of the bid accepted. Owner reserves the right to reject any or all proposals, to waive informalities in bidding, and to award a Contract for any part of the Work or the Project as a whole.

Award

Educational

$128,600.00

Public - State/Provincial

Paving, Site Work

6

12

6

5

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Contingency Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Utilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
43
Bidding Soon
629
All Active Projects
287
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2024

June 3, 2024

img_map_placeholder

Multiple Locations, Waterloo, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.