BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Pittsburg, Texas. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

For Ps&e Package Questions Call: Chris Graf, P.e. 2495 Hwy 183 N Brownwood, Tx 76802 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 Length: 0.40 Mi Time for Completion: 291 Working Days For Questions Regarding a Proposal Call 512/416-2498 County Control Limits From Highway Project Limits to ------------------------------------------------------------------------------ Comanche 0923-17-090 Cr 260 at South Leon River Cr Br 2024(354) . Length: Miles Comanche 0923-17-083 Cr 382 at Resley Creek Cr Br 2022(563) . Length: 0.10 Miles Comanche 0923-17-084 Cr 392 at Resley Creek Cr Br 2023(226) . Length: 0.10 Miles Comanche 0923-17-085 Cr 250 at South Leon River Cr Br 2024(317) . Length: 0.10 Miles Comanche 0923-17-092 Cr 235 at South Leon River Cr Br 2024(068) . Length: Miles Stephens 0923-22-023 Cr 146 at Gonzales Creek Cr Br 2024(318) . Length: 0.10 Miles TX DOT - Bridge Replacement

Bid Results

Bridges / Tunnels

$3,808,132.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

399

5

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
48
Bidding Soon
849
All Active Projects
388
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 6, 2024

May 6, 2024

June 17, 2025

img_map_placeholder

FM 993, Pittsburg, TX

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.