BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 19, 2024 at 8:00 PM

Updated April 20, 2024

Site work and paving for a mixed-use development in Fosston, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of April 19, 2024, project was awarded to Gordon Construction, in the amount of $232,531.45.** Site Directions: Omland Court is located 0.1 miles north of US-2 along the east side of CSAH 30 in Fosston, MN Est. Completion Date: Aug. 30, 2024 Removal and replacement of two (2) existing cul-de-sacs in Omland Court. Project Involves: BASE BID: Mobilization - 1 Lump Sum; Clearing and Grubbing - 3 Trees, Sawing Bituminous Pavement - 64 Lin Ft, Remove Bituminous Pavement - 4,582 Sq Yd, Remove Concrete Walk/Driveway - 294 Sq Ft, Salvage & Reinstall Sign - 2 Each, Salvage & Reinstall Mailbox - 14 Each, Excavation-Common - 600 Cu Yd, Geotextile Fabric Type 5 - 2,932Sq Yd, Aggregate Surfacing Class 5 - 130 Cu Yd, Aggregate Base Class 5 - 1,427 Ton, Type SP 12.5 Wearing Course Mix (2,B) - 416 Ton, Concrete Curb and Gutter D218 - 940 Lin Ft, 6" Concrete Pavement - 27 Sq Yd, Traffic Control - 1 Lump Sum, Erosion Control Supervisor - 1 Lump Sum, Sediment Control Log Type Wood Chip - 120 Lin Ft, Common Topsoil Borrow - 214 Cu Yd, Turf Establishment - 1 Lump Sum, Erosion Control Blanket - 324 Sq Yd ALTERNATE #1: Excavation-Common - 67 Cu Yd, Type SP 12.5 Wearing Course Mix (2,B) - 139 Ton ALTERNATE #2: Remove Concrete Footing (Full Depth) - 51 Each, Remove Concrete Walk/Driveway - 2,767 Sq Ft, Turf Establishment - 1 Lump Sum Minimum wage rates to be paid by the Contractors have been predetermined and are subject to the Work Hours Act of 1962, P.L. 87-581 and implementing regulations. BID SECURITY Each proposal must be accompanied by a bid guaranty in the amount of five (5) percent of the total amount of the bid. The bid guaranty may be by certified check or bid bond made payable to the City of Fosston. RESPONSIBLE CONTRACTOR No construction contract will be awarded unless the Bidder is a "responsible contractor" as defined in Minnesota statute 16C.285, subdivision 3. All Bidders submitting a proposal for this project must verify that they meet the minimum criteria specified in the statute by submitting a Responsible Contractor Verification and Certification of Compliance form (attached) with their bid. The owner or officer of the company must sign the form under oath verifying compliance with each of the minimum criteria. Making a false statement under oath will render the Bidder or subcontractor that makes the false statement ineligible to be awarded a construction project and may result in termination of a contract awarded to a Bidder or subcontractor that submits a false statement.

Award

Roads / Highways

$232,531.00

Public - City

Paving, Site Work

17

10

2

5

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
12
Bidding Soon
257
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2024

May 1, 2024

Project location map

N Omland Ave, Fosston, MN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.