BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 21, 2024 at 7:00 PM

Updated February 22, 2024

Renovation of a municipal facility in Appleton, Wisconsin. Completed plans call for the renovation of a municipal facility.

The sealed envelope containing your bidder shall show the name of the bidder and must be clearly marked "Bid - Fire Alarm Replacement". Any bid or unsolicited amendments to a bid received after the closing date and time will not be considered. Scope of Work Contractor shall provide a complete and functional Notifier fire alarm system. The following shall be included in the scope of work: Create CAD drawing for the new fire alarm system. Drawings and system shall meet all local and NFPA codes. Provide and install new Notifier components on a one to one basis to replace existing devices and panels. Any extra devices that are required in order to meet code requirements shall not be included in the base bid. If extra devices are required they will be added as a change order once the device requirement is determined. All devices shall be new and current Notifier devices that are compatible with the NFW-100X panel. Install device cabling as needed. Provide and connect 120 V circuits as needed. Remove existing TECC devices and turn them over to the owner. Owner shall be responsible for patching, painting and damaged ceiling tiles directly related to the project, however contractor shall work to minimize any damage. Obtain and pay for any needed permits and work with City inspectors as needed for an approved system. Work can be performed during normal business hours Mondays through Fridays excluding County observed holidays. The building will be occupied during this project and contractor must work to minimize disruptions as much as is reasonably possible. Testing of horns or other unusually loud activities shall be performed outside of normal business hours. Contractor shall coordinate device replacement in a manner that minimizes downtime of the alarm system. Contractor shall also notify TECC monitoring company as needed throughout the project. All devices shall be installed to manufactures recommendations and specifications. Program fire alarm system as needed to accept and recognize new devices. Contractor shall test each device and the system at the completion of the project to assure all devices are working as required. Provide a one-year labor and materials warranty for project.

Award

Municipal

$31,021.00

Public - County

Renovation

8

3

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
70
Bidding Soon
632
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2024

March 21, 2024

Project location map

3030 Goodland Dr, Appleton, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.