EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 22, 2024 at 7:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Appleton, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; and sidewalk / parking lot.

MISC Sidewalk & Concrete Street Excavation Repairs. No Bid Shall Be Received Unless Accompanied by a Bid Bond (Uploaded Electronically During Bid Process) Equal To Five Percent of the Bid, Payable to the City as a Guarantee That if the Bid is Accepted, the Bidder Will Execute and File the Proper Contract and Bond Within 10 Days From the Date the Lowest Responsible Bidder's Bid Is Accepted. If the Bidder Fails to File Such Contract and Bond Within the Time Set by the City, the Bid Bond Shall Be Forfeited to the City as Liquidated Damages. Concrete Sidewalk the City Reserves the Right to Reject Any and All Bids or to Accept Any Bid Deemed for the Best Interests of the City and to Waive Any Informalities in the Bidding. The construction work covered by these specifications shall include the furnishing of all materials, equipment, and labor together with such appurtenances and incidentals as set forth in the specifications for the construction and reconstruction of handicap ramps, sidewalk, curb and gutter, concrete pavement, driveway aprons, adjustment and/or rebuilding of maintenance holes or inlet structures, inlet leads or storm laterals, and street excavation repairs of various types & sizes throughout the City of Appleton. Statements contained in these special provisions supersede any statements in other specifications included as part of this contract with which there may be a conflict. Contractor shall be responsible for all OSHA safety requirements. Failure by the Contractor to follow OSHA requirements may result in a stop work order from the City until the violation is corrected, or termination of the Contract, at the City's option. Contractor shall not be entitled to any additional compensation, over the original contract amount, or additional time to complete the project, for any delay resulting from a sanction pursuant to this section.

Award

Roads / Highways

$988,268.00

Public - City

Paving, Site Work

5

17

6

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
36
Bidding Soon
382
All Active Projects
214
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 29, 2024

April 15, 2024

img_map_placeholder

Multiple Locations, Appleton, WI

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.