BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Gunnison, Colorado. Contact the soliciting agency for additional information.

Gunnison County seeks to develop a Comprehensive Corridor Plan (Plan) and Land Use Resolution Amendments for the Highway 135 corridor between the City of Gunnison and extending to Mt. Crested Butte. Gunnison County worked collaboratively with its partner jurisdictions: City of Gunnison, Town of Crested Butte, and Town of Mt. Crested Butte; to develop the One Valley Resiliency Roadmap (OVRR). OVRR includes regional strategies and actions related to land use, transportation, and infrastructure for the Gunnison Valley. Included in those strategies is the development of a comprehensive corridor plan. The County seeks to support and enhance compact communities, agricultural operations, and protection of natural resources. The Plan will include strategies aligned with the Countys and State greenhouse gas emission goals, limit sprawl, house people where they work, and identify existing and proposed infrastructure in appropriate locations. The engagement process will ensure participation by underrepresented voices and key stakeholders. The Plan will identify areas appropriate for future development and streamline the development review process for these areas. Areas appropriate for development shall be based on the principles in the OVRR, current County standards for protection of natural resources and avoidance of hazards using reference data such as Mapped Geologic Hazards and the Gunnison-Sage Grouse Habitat Tool and the Colorado Parks and Wildlife Maps, compliance with existing adopted codes such as 2021 International Wildland Urban Interface Code (WUI), in addition to community input and guidance. Appropriate areas for development should have the ability to connect to existing utilities and transportation/transit infrastructure; be close to existing workplaces, retail, and personal/medical services; avoid hazardous areas, big game migratory corridors and sensitive wildlife habitat; and be proximate to municipalities. All inquires shall be directed to: Cathie Pagano, AICP, CEP Assistant County Manager for Community and Economic Development cpagano@gunnisoncounty.org Questions Due: February 5, 2024 Responses to Questions Due: February 12, 2024 The project shall be completed by April 30, 2025 Scope of Work: An outline of the work to be completed by the consultant. This should be inclusive of deliverables to be provided to the client. This may include separate studies, summaries, or other documentation not indicated in the Project Goals and Scope. Additional Items: Include all other pertinent information regarding this RFP, particularly anything that the proposer feels addresses why its business or team would be a good match for this project. The method of Contractor Selection has not been Determined at this time.

Conceptual

Roads / Highways

$200,000.00

Public - County

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
4
Bidding Soon
85
All Active Projects
31
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 28, 2024

img_map_placeholder

Multiple Locations, Gunnison, CO


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.