BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a clubhouse / community center in Winnipeg, Manitoba. Completed plans call for site work for a clubhouse / community center.

.1 The Work to be done under the Contract shall consist of the decommissioning and removal of a wading pool and building, the supply and construction of a new “spray to drain” spray pad, and the associated site development. .2 The major components of the Work are as follows: (a) Removal of the east rink (boards, surround, paving), shed and associated foundations and granular base course; (b) Removal and decommissioning of existing light standards and associated foundations (fixtures to be salvaged by the City); (c) Removal and decommissioning of a wading pool; (d) Design and construction of a straight-to-drain spray pad, including but not limited to all associated fixtures, drains, piping, electrical works and concrete spray basin, complete with all required permitting; (e) Supply and installation of a concrete spray pad and associated walkways and sitting areas; (f) Supply and Installation of water spray features; (g) Sewer, water and electrical connections; (h) Commissioning of the spray pad; (i) Removal of an existing playground (equipment and safety surfacing); (j) Supply and installation of playground equipment; (k) Supply and installation of rubberized protective surfacing and engineered protective surfacing complete with concrete curb edging; (l) Supply and installation of site furniture, signage, and receptacles; (m) Supply and installation of chain link fencing; (n) Supply and installation of a picnic shelter complete with helical piles, metal roof, and permitting; (o) Supply and installation of planting and planting beds; (p) Site restoration including site grading, topsoil, and sodding. D2.3 The funds available for this Contract are 1,400,000. Official bid documents must be obtained from www.merx.com

Post-Bid

Clubhouse / Community Centers

$1,400,000.00

Public - City

Site Work

15

5

6

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
51
Bidding Soon
530
All Active Projects
232
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 8, 2024

May 31, 2024

October 15, 2024

img_map_placeholder

715 Telfer St N, Winnipeg, MB

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.