BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Buffalo Grove, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

This project includes, but is not limited to, the following major work items: multi use path surface removal; aggregate base improvements; asphalt pathway paving; new limestone pathway; landscape restoration; and other appurtenant work within the Buffalo Creek Nature Preserve in the Village of Buffalo Grove. If you have any questions regarding this solicitation, please contact Brett Robinson at bgfinance@vbg.org. This work is subject to the wage provisions of the Illinois Prevailing Wage Act. 820 ILCS 130/0/01 et seq. and the Illinois Substance Abuse Prevention on Public Works Projects Act. 820 ILCS 265/1 et seq relative to prevailing wages of laborers, mechanics, and other workers employed in any Public Works as amended by Public Acts 86799 and 86693. The above segments will include existing pathway asphalt surface removal, removal and disposal of unsuitable material, preparation of base, new asphalt pathways, landscape restoration, and other associated improvements. The above segments will include earth excavation, geotechnical fabric installation, subbase granular material, limestone aggregate placement, landscape restoration, and other associated improvements. The Contractor shall commence the work to be performed under this contract, on or near Monday, Monday April 29, 2024. The work shall be prosecuted in such a manner and with such a supply of materials, equipment and labor as considered necessary to ensure its completion according to the time specified in the contract. The Contractor shall have ten (10) working days from the actual date the Contractor begins work to complete this project. All work shall be completed, regardless of what is awarded or the actual start date by Friday, June 7, 2024, including punch list items, as defined in Article 108.04 of the Standard Specifications. The estimated Village Board award date for this project is Monday, February 21, 2024. The Contractor will be required to post a Maintenance Bond for a period of One Year (1-yr) from date of final acceptance by the Village. Final acceptance will be the date the Final Payment is made to the Contractor. The bond shall be in a form acceptable to the Village in the amount of 10% (ten percent) of the awarded contract value. Unless under emergency situations, the Village will offer the Contractor the ability to fix or repair any item prior to the bond being called. If the Contractor elects to perform the repairs themselves, all work must be complete within 14 calendar days of notice from the Village or the Village reserves the right to perform the repairs themselves.

Bid Results

Roads / Highways

$97,584.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
414
Active Projects
191
Bidding Soon
3,827
All Active Projects
1,524
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 8, 2024

April 29, 2024

June 7, 2024

img_map_placeholder

Multiple Locations, Buffalo Grove, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.