Site work and paving for a mixed-use development in Buffalo Grove, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

This project includes, but is not limited to, the following major work items: concrete sidewalk removal and replacement; driveway pavement removal and replacement; and other appurtenant work on various street segments throughout the Village limits. If you have any questions regarding this solicitation, please contact Brett Robinson at bgfinance@vbg.org. The Contractor shall commence the work to be performed under this contract, on or near Monday, April 29, 2024. The work shall be prosecuted in such a manner and with such a supply of materials, equipment and labor as considered necessary to ensure its completion according to the time specified in the contract. The Contractor shall have ten (10) working days from the actual date the Contractor begins work to complete this project. An additional two (2) working days will be allowed if the Village awards the Alternate. All work shall be completed, regardless of the actual start date by Friday, June 7, 2024, including punch list items, as defined in Article 108.04 of the Standard Specifications. The estimated Village Board award date for this project is Monday, February 21, 2024. This work is subject to the wage provisions of the Illinois Prevailing Wage Act. 820 ILCS 130/0/01 et seq. and the Illinois Substance Abuse Prevention on Public Works Projects Act. 820 ILCS 265/1 et seq relative to prevailing wages of laborers, mechanics, and other workers employed in any Public Works as amended by Public Acts 86799 and 86693. The Contractor will be required to post a Maintenance Bond for a period of One Year (1-yr) from date of final acceptance by the Village. Final acceptance will be the date the Final Payment is made to the Contractor. The bond shall be in a form acceptable to the Village in the amount of 10% (ten percent) of the awarded contract value. Unless under emergency situations, the Village will offer the Contractor the ability to fix or repair any item prior to the bond being called. If the Contractor elects to perform the repairs themselves, all work must be complete within 14 calendar days of notice from the Village or the Village reserves the right to perform the repairs themselves.

Post-Bid

Roads / Highways

$3,000,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
198
Active Projects
129
Bidding Soon
2,069
All Active Projects
883
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 8, 2024

April 29, 2024

img_map_placeholder

Multiple Locations, Buffalo Grove, IL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.