BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 21, 2025 at 8:00 PM

Updated August 22, 2025

Renovation of a clubhouse / community center in Fort Bragg, California. Working plans call for the renovation of a clubhouse / community center.

As of August 21, 2025 the project is currently in preconstruction and procurement phase. The owner states that construction will tentatively begin in late September 2025 and be completed in late November 2025. Closed solicitation has been included below for reference. ............ The City of Fort Bragg is seeking proposals from qualified Design firms interested in providing plans and specifications for the Heating, Ventilation, and Air Conditioning (HVAC) System Replacement Project at the C.V. Starr Community Center at 300 South Lincoln Street, Fort Bragg, California. Printed proposal should be 8 1/2 x 11 inches, printed two-sided on recycled and recyclable paper with removable bindings, bound in a single document and organized in sections following the order specified under contents. Deadline for Written Questions: February 14, 2024 Selection: March 11, 2024 This Contract will consist of the following tasks: 1. Conduct a field investigation of the facility to verify the existing conditions of the mechanical equipment and building controls. Compare existing engineered drawings and details (Exhibit B) against field conditions, and ensure the finalized construction documents align with existing conditions. 2. Attend regular meetings throughout the design process with the City of Fort Bragg and Starr Center Staff to confer on facility requirements, material preferences, and logistical/safety considerations. 3. Prepare Plans, Specifications, and Cost Estimates complete in detail and containing all necessary information consistent with standard professional practice and incorporating all design drawings for permitting and construction. The 100% submittal shall include: Compliance with the Current California Building Code and Title 24. Considerations for proper disposal of existing equipment in accordance with the City's construction and demolition waste recycling ordinances. Estimated Number of Working Days. Submittal of an electronic copy of the finished Plans, Specifications, and Cost Estimate in Word documents, PDFs, and/or autoCAD as appropriate. One (1) full-size plan set signed by a California Licensed Architect or Licensed Engineer. 4. Coordinate and respond to Requests for Information, review and respond to Submittals, and other design-related documents as requested during the bid process and until project completion. 5. Provide Construction Support Services for questions and minor amendments as needed in coordination with the City's Project Manager during project construction and until project completion The method of Contractor Selection has not been Determined at this time.

Pre-Construction/Negotiated

Clubhouse / Community Centers

$500,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
12
Bidding Soon
150
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.