Published February 8, 2024 at 7:00 PM

Updated February 21, 2024

Renovation of a municipal facility in Charlottetown, Prince Edward Island. Completed plans call for the renovation of a municipal facility.

Work of this contract includes but is not limited to: . 1 Provision and installation of intercommunications hardware as shown including associated electrical and communications hardware. .2 Provision and installation of Barrier free columns, and hardware to suite. .3 Provision and installation of wayfinding signage and kiosk. .4 Provision and installation of tactile indicators and nosing. .5 Provision and installation of glazing film. .6 Provision and installation of grab bars. .7 Contractor to note this is a brownfield site. A) Bids Submitted at $100,000 or Greater Shall Include the Following by the Closing Date and Time: A Bid Bond in a Commercially Reasonable Form or an Irrevocable Standby Letter of Credit Issued by a Financial Institution Authorized to Conduct Business in Canada as a Schedule I or Schedule Ii Chartered Bank in the Amount of at Least 10% of the Bid Price and That Shall Be in Effect Until Forty-five (45) Calendar Days Following Closing Date. A Suretys Consent Indicating That, in Accordance With Section 5.18.1. Of This Itt, the Surety Company Will Furnish the Contract Security Which Shall Include a 50% Performance Bond and a 50% Labour and Materials Payment Bond of the Bid Price or a Consent From the Schedule I or Schedule Ii Chartered Bank That an Irrevocable Standby Letter of Credit in the Amount of 50% of the Bid Price Will Be Furnished. Official bid documents must be obtained from www.bgis.merx.com and bid submissions must be done through the Merx platform. Question Acceptance Deadline: Feb 07, 2024 02:00 PM AST question deadline date extended from 02/07/2024 to 02/14/2024 02:00 PM AST

Post-Bid

Municipal

$200,000.00

Public - Federal

Renovation

9

23

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Project Management and Coordination, Project Meetings, Construction Progress Documentation, Construction Progress Schedule, Special Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Manufacturer?s Field Services, Temporary Facilities and Controls, Temporary Utilities, Construction Facilities, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Submittals, Maintenance Data, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Cast-in-Place Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Steep Slope Roofing, Shingles and Shakes
Division 08 - Openings

Division 08 - Openings

Windows, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Flooring, Resilient Flooring, Resilient Sheet Flooring, Terrazzo Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Toilet, Bath, and Laundry Accessories
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Hangers and Supports for HVAC Piping and Equipment, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Common Work Results for Communications, Pathways for Communications Systems, Voice Communications, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Intercommunications and Program Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Earth Moving, Excavation and Fill, Excavation, Fill, Erosion and Sedimentation Controls, Shoring and Underpinning, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
14
Bidding Soon
172
All Active Projects
79
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2024

March 12, 2024

img_map_placeholder

191 Great George St, Charlottetown, PE

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.