BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 5, 2025 at 8:00 PM

Updated June 6, 2025

Site work for a civil project in Lower Lake, California. Design plans call for site work for a water / sewer project.

As of June 5, 2025, this project is in the design phase. A timeline for construction has not yet been established. *Previous solicitation listed below for reference:* The overall budget is 5,600,000. Provide professional architectural and engineering design for the above project. This project includes, but is not limited to, Repair and replacement of site water laterals and the installation of gate valves in yard boxes for eight (8) buildings. Replace existing water storage tanks for both the fire suppression and domestic water supply. This portion of the work needs to be phased to allow for the continued operation of the facility and the fire and life safety systems on the camp site. Replace the existing tanks (four (4) Concrete Tanks, one (1) Corrugated Metal Fire Water Tank) with two (2) each 60,000-gallon steel water tanks. Separate the irrigation line from the existing domestic / fire water distribution system. Replace the existing potable water treatment system. This also needs to be phased to allow for the continued operation of the camp site and minimize the down time for the sanitary sewer system. Portable showers and restrooms may be required to complete this scope of work. Replace the existing wastewater treatment plant. Relocate the existing canopy over the existing wastewater treatment plant to the new plant location. Sawcut, remove and replace existing asphalt paving at water and irrigation line repairs. Construct asphalt paved access road to the new wastewater treatment plant location. Selective Demolition as required to complete all scopes of work. Hazardous materials are likely to be present. The camp will be occupied during the entirety of the construction process. All technical questions should be directed to Courtney Wetsell at 279-799-4650, or courtney.wetsell@dgs.ca.gov. All questions regarding the submission of SOQs should be directed to Jessica McDaniel, Contracts Analyst, at jessica.mcdaniel@dgs.ca.gov or Nora Sandstedt at nora.sandstedt@dgs.ca.gov. All work shall be performed under and approved by a design professional, or contractor, licensed in the State of California. The estimated cost of construction for the project contract value is $ 5,600,000.00. The estimated duration of this contract will be 2.5 years. The method of Contractor Selection has not been Determined at this time.

Design

Water / Sewer

$5,600,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
7
Bidding Soon
908
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2025

Project location map

8275 CA-29, Lower Lake, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.