Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 8, 2025 at 8:00 PM
Updated September 9, 2025
Site work and paving for a mixed-use development in Lebanon, New Hampshire. Design plans call for site work for a playground / park / athletic field; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
As of September 8, 2025, a design firm has been selected. A timeline for construction has not yet been established. *Previous solicitation listed below for reference:* The Mascoma River Greenway (MRG) is currently 2.3 miles long, but envisioned as a 4 mile long section of the Northern Rail Trail, already identified as a high recreation and transpor Road. As a 10-12 foot wide paved path, completed in 2018, and hosting 240 users in an average day (according to UVLSRPC 2020 counts), the strategic East-West alignment provides residents and visitors a viable non-motorized method to both recreate and reach places they want to go. With the completion of this proposed neighborhoods with workplaces, schools, child care centers, open spaces, shopping areas, medical center and transit stops. PHASE1 2025 • Work will begin at the western end of the bridge over the Mascoma River under Route 4. A portion of the existing stone dust trail will be regraded and paved, new trail will begin at the second crossing of the existing path and the railroad. Approximately 1,000 feet. • From that point, the trail will follow the existing rail corridor ending at Riverside Park. The trail will leave the rail corridor after the second Mascoma River Crossing, sloping down to meet existing grades at Riverside Park. This estimate assumes that portion of the trail will be built into the existing side slope of the rail corridor. The trail will be wide enough to allow pickup truck access, and will attempt to meet full ADA requirements. Approximately 1,800 feet, including the path to the park. There are approximately 250 feet of bridges in this segment. • Powerhouse Mall path along the easement, in conjunction with the Powerhouse Mall repaving project. • Construct the Lebanon Ford trail and bridge connector to the MRG. PHASE2 2026 • Widen the existing riverwalk along the Mascoma River at Riverside Community Park to at least 8’ but preferably 10’. This is approximately 2,650 feet to the Powerhouse Mall. An additional 500 feet of trail is included as a potential secondary route in order to bypass pinch points that will not allow the minimum widening. • Paving
Design
Playgrounds / Parks / Athletic Fields
$2,368,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2026
To Be Determined, Lebanon, NH
Related To This Project
Lebanon, NH
--
Lebanon, NH
--
Lebanon, NH
Bid Date: Mar 11 2024
Lebanon, NH
Bid Date: Mar 08 2024
Lebanon, NH
--
Lebanon, NH
Bid Date: Feb 12 2024
Lebanon, NH
Bid Date: Feb 07 2024
Lebanon, NH
Bid Date: Jan 19 2024
Lebanon, NH
--
Lebanon, NH
Bid Date: Dec 11 2023
Lebanon, NH
Bid Date: Dec 07 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
