BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 8, 2025 at 8:00 PM

Updated September 9, 2025

Site work and paving for a mixed-use development in Lebanon, New Hampshire. Design plans call for site work for a playground / park / athletic field; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of September 8, 2025, a design firm has been selected. A timeline for construction has not yet been established. *Previous solicitation listed below for reference:* The Mascoma River Greenway (MRG) is currently 2.3 miles long, but envisioned as a 4 mile long section of the Northern Rail Trail, already identified as a high recreation and transpor Road. As a 10-12 foot wide paved path, completed in 2018, and hosting 240 users in an average day (according to UVLSRPC 2020 counts), the strategic East-West alignment provides residents and visitors a viable non-motorized method to both recreate and reach places they want to go. With the completion of this proposed neighborhoods with workplaces, schools, child care centers, open spaces, shopping areas, medical center and transit stops. PHASE1 2025 • Work will begin at the western end of the bridge over the Mascoma River under Route 4. A portion of the existing stone dust trail will be regraded and paved, new trail will begin at the second crossing of the existing path and the railroad. Approximately 1,000 feet. • From that point, the trail will follow the existing rail corridor ending at Riverside Park. The trail will leave the rail corridor after the second Mascoma River Crossing, sloping down to meet existing grades at Riverside Park. This estimate assumes that portion of the trail will be built into the existing side slope of the rail corridor. The trail will be wide enough to allow pickup truck access, and will attempt to meet full ADA requirements. Approximately 1,800 feet, including the path to the park. There are approximately 250 feet of bridges in this segment. • Powerhouse Mall path along the easement, in conjunction with the Powerhouse Mall repaving project. • Construct the Lebanon Ford trail and bridge connector to the MRG. PHASE2 2026 • Widen the existing riverwalk along the Mascoma River at Riverside Community Park to at least 8’ but preferably 10’. This is approximately 2,650 feet to the Powerhouse Mall. An additional 500 feet of trail is included as a potential secondary route in order to bypass pinch points that will not allow the minimum widening. • Paving

Design

Playgrounds / Parks / Athletic Fields

$2,368,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
218
Active Projects
124
Bidding Soon
1,592
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2026

Project location map

To Be Determined, Lebanon, NH


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.