BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Lebanon, New Hampshire. Conceptual plans call for site work for a playground / park / athletic field; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of August 12, 2024, this project is still in the conceptual phase. Design should begin in 2025. The Mascoma River Greenway (MRG) is currently 2.3 miles long, but envisioned as a 4 mile long section of the Northern Rail Trail, already identified as a high recreation and transpor Road. As a 10-12 foot wide paved path, completed in 2018, and hosting 240 users in an average day (according to UVLSRPC 2020 counts), the strategic East-West alignment provides residents and visitors a viable non-motorized method to both recreate and reach places they want to go. With the completion of this proposed neighborhoods with workplaces, schools, child care centers, open spaces, shopping areas, medical center and transit stops. PHASE1 2025 • Work will begin at the western end of the bridge over the Mascoma River under Route 4. A portion of the existing stone dust trail will be regraded and paved, new trail will begin at the second crossing of the existing path and the railroad. Approximately 1,000 feet. • From that point, the trail will follow the existing rail corridor ending at Riverside Park. The trail will leave the rail corridor after the second Mascoma River Crossing, sloping down to meet existing grades at Riverside Park. This estimate assumes that portion of the trail will be built into the existing side slope of the rail corridor. The trail will be wide enough to allow pickup truck access, and will attempt to meet full ADA requirements. Approximately 1,800 feet, including the path to the park. There are approximately 250 feet of bridges in this segment. • Powerhouse Mall path along the easement, in conjunction with the Powerhouse Mall repaving project. • Construct the Lebanon Ford trail and bridge connector to the MRG. PHASE2 2026 • Widen the existing riverwalk along the Mascoma River at Riverside Community Park to at least 8’ but preferably 10’. This is approximately 2,650 feet to the Powerhouse Mall. An additional 500 feet of trail is included as a potential secondary route in order to bypass pinch points that will not allow the minimum widening. • Paving As of January 29, 2024, this project is included in the City of Lebanon's FY 2024-2029 CIP and funding is allotted for construction in FY 2025 and FY 2026. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Playgrounds / Parks / Athletic Fields

$2,000,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
191
Active Projects
106
Bidding Soon
1,508
All Active Projects
586
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 2, 2025

img_map_placeholder

To Be Determined, Lebanon, NH


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.