Site work for a water / sewer project in Henderson, Tennessee. Completed plans call for site work for a water / sewer project.

Construction of North Avenue Water Line Replacement, Henderson, Tennessee, consisting of approximately 1,900 LF 8-inch water line including Gate Valves, Fire Hydrants, and Relocation of Existing Water Meters along North Avenue, together with all related work as specified and shown on the Drawings. All questions about the meaning or intent of the Contract Documents are to be directed to Engineer. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Contract Documents. Questions received less than five days prior to the date for Opening of Bids may not be answered. The allotted time for construction is 90 calendar days. Every request for such interpretation should be in writing addressed to GRW Engineers, Inc. at 404 BNA Drive, Suite 201 Nashville, TN 37217 The CONTRACT DOCUMENTS, consisting of Information to Bidders, Bid, Bid Bond, Agreement, Performance Bond, Payment Bond, Specifications, Plans, and other contract documents may be examined at the following locations: City of Henderson, 121 Crook Ave Henderson, TN GRW Engineers, Inc. 404 BNA Drive, Ste. 201 Nashville, TN 37217 The Owner reserves the right to waive any informalities and to reject any or all bids. All bidders must be licensed General Contractors as required by the Contractor's Licensing Act of 1994 of the General Assembly of the State of Tennessee and be qualified for the type of construction being bid upon. This project is being supported with Treasury, Coronavirus State and Local Recovery Fund grant funding. Therefore, certain restrictions and other federal requirements attach to this opportunity. The Copeland "Anti-Kickback" Act is also applicable, which prohibits workers on construction contracts from giving up wages that they are owed. A detailed listing of all subcontractors shall be provided by the Bidder. In accordance with the Contract Documents, documentation that the prospective General Contractor and its subcontractors meet minimum qualifications shall be provided and submitted. Subcontractors must also not appear on Sam.gov disbarment list. Mark-ups on subcontractor work or Cost Plus Overhead will be disallowed for reimbursement. As appropriate and to the extent consistent with law, the subrecipient should, to the greatest extent practicable under a federal award, provide a preference for the purchase, acquisition, or use of goods, products, or materials produced in the United States (including, but not limited to iron, aluminum, steel, cement, and other manufactured products), A bid bond or certified check for five percent (5%) of the total bid amount must accompany each bid. The successful bidder will be required to furnish a performance and payment bonds in the amount of his bid. Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the contract, Section 3, Segregated Facility, Section 109 and E.O. 11246. No bidder may withdraw his bid for a period of sixty (60) days after closing time scheduled for the receipt of bids. This project is supported by the American Rescue Plan Act funding, under a grant contract with the State of Tennessee, Department of Environment and Conservation. Questions received less than five days prior to the date for Opening of Bids may not be answered. SCOPE OF WORK A. Furnish all labor and equipment required to dewater all excavations. B. Dewatering of all excavations shall be the responsibility of the Contractor, and no additional compensation will be allowed for same unless specifically included as a bid item. SCOPE OF WORK A. This Section includes, but is not limited to, the following: 1. Shoring and bracing necessary to protect existing buildings, streets, walkways, utilities, and other improvements and excavation against loss of ground or caving embankments. 2. Maintenance of shoring and bracing. 3. Removal of shoring and bracing, as required. B. Types of shoring and bracing systems include, but are not limited to, the following: 1. Steel H-section (soldier) piles. 2. Timber lagging. 3. Steel sheet piles. 4. Portable Steel Trench Box.

Award

Water / Sewer

$588,282.00

Public - City

Site Work

8

13

2

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
27
Bidding Soon
380
All Active Projects
163
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 7, 2024

March 8, 2024

img_map_placeholder

North Ave, Henderson, TN


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.