BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 20, 2024 at 8:00 PM

Updated August 21, 2024

Site work for a water / sewer project in Highland Park, Illinois. Completed plans call for site work for a water / sewer project.

The storm sewer along Maple Avenue from St. Johns Avenue to the east end is in need of replacement. The new storm sewer will be designed to current standards, including the use of more recently approved storm rainfall data. The new data provides for a more conservative design that captures a higher level of storm water runoff. A new storm outfall will be constructed at the east end, with the outfall located in the ravine. Other improvements include new concrete curb and gutter, and pavement reconstruction. At the east end, a small section of 4-inch water main will be replaced with a new 8-inch ductile iron water main. Other improvements include parkway restoration with topsoil and sod. This project is included in the city’s 2024-2033 Capital Improvement Program (CIP). As of January 31, 2024, per owner, currently in design, design team has not been identified. Construction anticipated in early Summer 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Award

Water / Sewer

$1,458,916.00

Public - City

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
509
Active Projects
283
Bidding Soon
3,651
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 18, 2024

August 19, 2024

Project location map

Maple Ave, Highland Park, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.