BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of a mixed-use development in Nashville, Tennessee. Completed plans call for the renovation of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; playground / park / athletic field; playground / park / athletic field; and playground / park / athletic field.

The project will consist of the Construction and restoration of key park amenities at Brookmeade Park which have deteriorated while the park was occupied by the unsheltered. Scope of work and project summary / requirements: * The Contractor shall erect and maintain erosion and sediment controls for the entire construction period and remove controls at the end of the project. * The Contractor shall erect and maintain tree protection fencing for the entire construction period and remove fencing at the end of the project. * The Contractor shall remove any debris and trash left over from the unsheltered. Extent shall be confirmed onsite with client representative and project Landscape Architect. * The Contractor to remove the existing wood lookout structure, including handrail and dispose of material in a legal manner. * The Contractor to remove the existing wood boardwalk structure, including handrail and dispose of material in a legal manner. * The Contractor to remove select portions of the existing asphalt greenway trail. Extent shall be confirmed onsite with client representative and project Landscape Architect prior to removal. Dispose of material in a legal manner. * The Contractor to saw cut and remove select portions of the existing concrete curbs around the ADA landings. Contractor to confirm extent with client representative and project Landscape Architect prior to removal. Dispose of material in a legal manner Contractor to rectify the existing land depression onsite (as shown on plans) by select minor grading of the area. * The Contractor to power wash and clean the existing greenway trail and apply sealant to the asphalt. * The Contractor shall remove the existing trailhead sign panel and dispose of legally. Contractor to coordinate with trailhead sign manufacturer for timing of installation of new sign.

Post-Bid

Playgrounds / Parks / Athletic Fields

$900,000.00

Public - County

Paving, Renovation, Site Work

13

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
11
Bidding Soon
681
All Active Projects
233
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2024

March 21, 2024

img_map_placeholder

7004 Charlotte Pike, Nashville, TN

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.