Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 2, 2024 at 8:00 PM

Updated April 3, 2024

Renovation of a water / sewer project in Marion, Ohio. Completed plans call for the renovation of a water / sewer project.

The Owner requires that all work associated with the project be completed before Friday, October 4, 2024. This is a Davis Bacon wage contract in accordance with Ohio Revised Code Chapter 4111 and the requirements of the Ohio Department of Commerce, Division of Labor and Worker Safety, Wage and Hour Bureau. Bidders shall comply with all applicable provisions. Engineer s Estimate: $811,000.00 Domestic Steel Use Requirements This project is being partially funded with monies made available by the us treasury under the coronavirus state and local fiscal recovery fund program which has statutory requirements commonly known as American Iron And Steel; that requires all of the iron and steel products used in the project to be produced in the united states ( American Iron And Steel Requirement ) including iron and steel products provided by the contractor. No bids shall be withdrawn for a period of (60) days after the opening thereof. Awarding of the contract shall be to the Lowest and Best bidder as determined by the Marion County Board of Commissioners in the best interest of the County. The Board reserves the right to reject any or all bids. Bid shall be accompanied by a Bid Security in the form of a bid bond in the amount of one hundred percent (100%) of the bid or a certified check in the amount of ten percent (10%) of the bid. In addition to the Bid Security, a one (1) year Performance Bond is required for this project in the amount of one hundred percent (100%) of the total project cost, and may be submitted with the Bid Proposal. Document note: Checks shall be made payable to K.E. McCartney & Associates and all documents become the property of the prospective bidder, with no portion of the payment being refunded. please forward a request in writing to the Engineer for interpretation

Bid Results

Water / Sewer

$841,000.00

Public - County

Renovation

14

15

4

5

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 29, 2024

March 18, 2024

Project location map

1534 Mt Vernon Ave, Marion, OH

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed