BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Demolition, site work and addition to a civil project in Richmond, Texas. Completed plans call for the addition of a bridge / tunnel; for the demolition of a bridge / tunnel; for site work for a bridge / tunnel; water / sewer project; water / sewer project; and bridge / tunnel.

Questions will not be considered after 12:00 p.m., noon, three (3) calendar days prior to bidding. Location: The project is located at 2455 1/2 Harlem Road, Richmond, Texas 77406, approximately two (2) miles south of the intersection of Harlem Road and Grand Parkway, in Fort Bend County, Texas (Fort Bend County Key Map 566-L). The work consists of providing the necessary labor, material, equipment, and supervision to construct Harvest Green Wastewater Treatment Plant Expansion to 0.95 MGD and Lift Station for Fort Bend County Municipal Utility District No. 134E. The site work contractor is responsible for all site work, including but not limited to clearing and grubbing of the site; demolition of existing chain link fencing; relocation of entrance gate; chain link fence; twenty-one-foot (21') diameter concrete wet well with three (3) submersible pumps with all accessories, riser piping, valves, protective coatings and supports; demolition and relocation of existing yard piping; yard piping; manholes; modifications to existing manholes; site work; on-site crushed concrete roads and IWTP pads; protective coatings; concrete pads; swales; culverts; inlets; modifications to existing headworks; proposed elevated headworks; dumpster pad with sump pump; new electrical service; service entrance equipment; automatic transfer switch; service/distribution rack; diesel generator; lift station control panel; underground duct banks; terminal boxes at Digester No. 3 and the Chlorine Contact Basin; wires and conduits from the terminal boxes at Digester No. 3 and the Chlorine Contact Basin to the service rack; installation of the PLC panel at the service rack; pull boxes; grounding; bollards; site grading; all associated electrical and site work; facility start-up in its entirety; and all else specified and shown in the construction documents and not specifically addressed in lease agreement, complete in place for a fully functioning plant. The lease of the 585,000 gallon per day interim package wastewater treatment plant facilities shall include delivery and assembly of the facilities with all accessories and equipment; including aeration basins; multi-stage digester units; final clarifiers; chlorine contact basin; non-potable water system; chlorine gas disinfection equipment and disinfection equipment building; eyewash and safety shower with canopy; walkways, bridges, and handrails; air diffusion equipment; air lifts; flow measurement equipment and PLC control panel; blowers; aboveground interconnecting piping, valves, fittings, supports; hose bibbs; control panels for equipment including the blowers, clarifiers, non-potable water system, disinfection equipment and effluent flow measurement; basin lighting, and all other electrical plant devices; and electrical wiring (including wiring to the terminal boxes at Digester No. 3 and the Chlorine Contact Basin); and all accessories, equipment, piping, etc. within the plant, complete as specified. Within the lease scope is all the plant related functions from the stub ups for the screened influent piping upstream of Aeration Basin No. 1 and Aeration Basin No. 5 and the stub up for the effluent piping downstream of the chlorine contact basin; and everything in between. The installation of the leased facilities shall be the responsibility of the lease plant vendor. Installation includes all delivery, installation and start-up. The site work contractor shall coordinate with the lease plant vendor for all connections and slab dimensions. At the leased facilities, the site work contractor is responsible for all site work shown in the construction drawings including all work not associated with the leased facilities. However, the site work contractor is responsible for concrete slabs and pads, and all buried piping located within the limits of the proposed leased facilities. All buried piping shall be installed with a flanged stub-up approximately 12-inches (12") above finished grade at all locations. The site work contractor shall perform all electrical work including connection from a new electrical service to the service rack including all aboveground conduit and wire to pads. The plant lease contractor is responsible for all electrical work downstream of the local control panels, including the control panels. The site work contractor is responsible for all underground duct bank work and all other electrical work from the main service rack to the local control panels for the leased equipment. The site work contractor is responsible for coordination with plant lessor firm to coordinate pipe and electrical connections, buried pipe locations, deliveries and schedules.

Post-Bid

Water / Sewer

$10,100,000.00

Public - County

Addition, Demolition, Site Work

83

20

19

5

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
78
Bidding Soon
2,744
All Active Projects
972
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2024

May 6, 2024

img_map_placeholder

2455 Harlem Rd, Richmond, TX


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.