BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 17, 2025 at 8:00 PM

Updated July 18, 2025

Site work, paving and outdoor lighting for a mixed-use development in Union, Missouri. Design plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and for outdoor lighting for a road / highway.

As of July 17, 2025, per owner, construction in 2027. Design team identified. A construction contractor won't be selected until 2027. Federal Aid No: STBG - 6200(617) Location: Denmark Road at Progress Parkway Length : 0.4 miles DBE Goal Determination: 10% Proposed Improvement: Intersection improvements, pavement repair, add ADA compliant sidewalk and pedestrian improvements, lighting Engineering responsibilities may include but are not limited to preparation of Conceptual plans, Preliminary plans, Contract plans, and Right of Way plans. Design services may include but are not limited to surveying, geotechnical investigations, traffic studies and reports, ADA compliance survey, subsurface utility exploration, storm sewer design, intersection design, roadway design, public involvement, environmental and historic preservation services/permits, contract documents, assisting with the bidding process, utility coordination/permits, and traffic controls design, including preparation of PS&E and final documents. Construction engineering responsibilities may include but are not limited to work with contractor on behalf of the City, assist with preconstruction conference, construction inspection, inspection and testing construction materials, construction support, prepare change orders, review shop drawings and material submittals, be present during critical construction operations, work with City to do full time inspections and reporting and participate in final inspection. Contact: J.D. Kelley, P.E. 10 E Locust St Union, MO 63084 636-583-1805 engineer@unionmissouri.gov MODOT - RFQ Engineering - Intersection Improvements, Pavement Repair, Add ADA Compliant Sidewalk and Pedestrian Improvements, Lighting

Design

Roads / Highways

$745,786.00

Public - City

Outdoor Lighting, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
204
Active Projects
90
Bidding Soon
1,294
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2027

Project location map

Denmark Rd, Union, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.