BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 7, 2024 at 7:00 PM

Updated March 14, 2024

Demolition, site work, paving and new construction of a bridge / tunnel in Van Buren Township, Missouri. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; and for the demolition of a bridge / tunnel.

Project No. 3215 Project Location: The project is located 0.15 miles south of East Snow Road and South Helmig Road intersection, northwest of Lone Jack, Missouri as shown on the Plan Sheets. Proposed Work: The Contractor shall furnish all materials, equipment, tools and labor required for removal of the existing cast-in-place culvert and the installation of a double 10x 8 box culvert, including end sections. Additional work tasks include reshaping of the roadway shoulders and placement of rock blanket around the wingwalls to prevent erosion and all other incidental work in the most substantial and workmanlike manner, and do everything required by the Contract Documents as defined herein. All bidders must be on MoDOTs Qualified Contractor List per Section 102.2 of the Missouri Standard Specifications for Highway Construction, 2023 Edition including all revisions. Questions Due Date: Mar 6th 2024, 5:00 PM CST. No bidder may withdraw his bid within 90 days after the actual date of the opening thereof. The right is reserved to reject any or all bids. A Bid Bond or Cashiers Check (as detailed within the bid documents) shall be delivered to the Jackson County The project will be awarded to the lowest, responsive and responsible bidder MODOT - South Helmig Road Bridge Reconstruction

Post-Bid

Bridges / Tunnels

$9,000,000.00

Public - County

Demolition, New Construction, Paving, Site Work

33

14

2

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
170
Active Projects
92
Bidding Soon
1,091
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2024

May 14, 2024

Project location map

S Helmig Rd & E Snow Rd, Van Buren Township, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.