BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 15, 2024 at 8:00 PM

Updated March 16, 2024

Site work and paving for a civil project in Biltmore Forest, North Carolina. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

The project generally consists of: demolition of portions of existing stormwater system as well as surrounding features to facilitate construction; plugging and abandoning portions of existing stormwater system; installation of stormwater collection pipes; installation of catch basins, junction boxes, and headwalls; fine grading and installation of riprap; pavement and driveway repairs; and pavement mill and overlay along portions of Lone Pine Road, Stuyvesant Road, Vanderbilt Road, and Park Road within Biltmore Forest. Each bid shall be accompanied with a cash deposit or certified check drawn on a bank or trust company insured by the FDIC or a Bid Bond prepared on the form of Bid Bond contained in the Bidding Documents or a Surety Company's standard form and properly executed by a corporate surety licensed under the laws of North Carolina to execute such bonds. The amount of the bid bond shall be equal to five (5) percent of the total of the bid. The bid deposit shall be retained by the Owner if the successful bidder fails to execute the contract or fails to provide the required bonds, as stated above, within ten (10) days after the proper notice of award of the contract Bidders must comply with the requirements of the State of North Carolina and be appropriately licensed as a Contractor as provided in General Statutes Chapter 87. The Owner reserves the right to reject any and all Bids, to waive informalities, or to reject non-conforming, non-responsive, or conditional bids. The Owner reserves the right to award a contract to the lowest, responsive, responsible bidder or bidders, taking into consideration quality, performance and time. Question Deadline 02/22/2024 All questions about the meaning or intent of the Bidding Documents are to be submitted to the Engineer in writing. Interpretations or clarifications considered necessary by the Engineer in response to such questions will be issued by Addenda delivered by either mail or approved electronic means to all parties recorded by the Engineer as having received the Bidding Documents. Questions received less than five (5) days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Contractor waives the right to rely on information provided by the Engineer which is not provided in writing and in the form of a formal Addendum.

Award

Water / Sewer

$1,126,960.00

Public - City

Paving, Site Work

35

19

26

11

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
225
Active Projects
126
Bidding Soon
1,468
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2024

April 29, 2024

Project location map

Multiple Locations, Biltmore Forest, NC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.