BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a bridge / tunnel in Kearny, New Jersey. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of August 20, 2024, information regarding the award and award date has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to late 2024. *The closed solicitation has been included below for reference: Due to the confidential nature of this project, please refer to the owner for additional project information and documents. National Railroad Passenger Corporation ("Amtrak") is issuing this Request for Qualifications ("RFQ") to solicit Statements of Qualifications ("SOQ") from interested parties to perform Construction Manager at Risk ("CMAR") Services for the Sawtooth Bridges Replacement Project. The following objectives have been developed for this Project: Delivery of new bridges and increase track capacity along the Northeast Corridor (NEC) by adding two additional tracks to meet current and future capacity demand including our future ridership goals of reaching 66 million passengers by 2040. Enhance rail service as an energy-efficient mode of travel, minimize emissions, bolster reliability, and fortify resiliency and redundancy through the implementation of a state-of-the-art rail system. Achieve a state of good repair by the replacement of the bridges and their approach structures to ensure continuous safe rail connectivity along the NEC. Reduce service disruptions and delays and restore design speeds to 90MPH to enhance On Time Performance (OTP) and elevate the overall customer experience. Deliver the Project safely, on schedule and within budget. Maximize the innovation potential and collaboration of the CMAR delivery method. construction of the Project is anticipated to start with Early Enabling Components Quarter three of 2024 and be completed in various phases leading to final completion by fourth Quarter 2034. Amtrak will take the lead for all ROW acquisition. The RFP will provide further details on the CMAR Contractor's responsibilities with respect to property acquisitions.

Conceptual

Bridges / Tunnels

$600,000.00

Public - Federal

New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
509
Active Projects
238
Bidding Soon
4,658
All Active Projects
2,136
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2024

October 15, 2024

img_map_placeholder

To Be Determined, Kearny, NJ


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.