BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Atlanta, Georgia. Completed plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

This is a Midtown Alliance procurement of a City of Atlanta-sponsored project utilizing the following funds: Federal Transit Administration (FTA), City of Atlanta, and Midtown Improvement District. Midtown Alliance is serving as the Implementation Manager for the project. The project generally includes construction of right-of-way improvements including sidewalks, curbs, roadway, bicycle lanes, signage, landscaping, street trees, street lighting and traffic signals. Should any question or need for information arise, it should be directed to Midtown Alliance at business@midtownatl.com with subject line: 3000 Spring St (US-19/SR-9) Streetscape - [insert nature of email]. All questions must be submitted by email by 5:00 p.m. ET on February 20, 2024. The response to the questions will be sent as an addendum. No bid proposal will be considered unless accompanied by a certified check or acceptable Bid Bond in an amount not less than five percent (5%) of the bid and made payable to Midtown Alliance. Successful Bidder shall be required to furnish a Contract Performance Bond equal to 100% of the contract price and a Payment Bond equal to 110% of the contract price, with the terms and surety to be approved by Midtown Alliance and the City of Atlanta, and furnish satisfactory proof of carriage of the insurance required. The Disadvantaged Business Enterprise (DBE) goal for this project is 22.8%. All DBE firms must be certified with the Georgia D.O.T. Equal Employment Opportunity Office. Low Bid will be determined based on the sum of the base bid and any alternates selected by Midtown Alliance. The required forms, certifications and affidavits shall be submitted with the bid per the Bid Submittal Checklist. No bidder may withdraw her/his bid within one-hundred and twenty days (120) after the actual date of the opening thereof. The successful bidder shall commence work with adequate force and equipment on a date to be specified in a written order of the Implementation Manager and shall complete the work within 365 consecutive calendar days from and including said date.

Post-Bid

Sidewalks / Parking Lot

$568,000.00

Public - City

Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
284
Active Projects
144
Bidding Soon
2,140
All Active Projects
967
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 29, 2024

March 29, 2024

March 29, 2025

img_map_placeholder

Multiple Locations, Atlanta, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.