BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Solana Beach, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of April 4, 2024 , this project has not yet been awarded. The project is expected to be awarded on April 24, 2024. Reference Number 0000340888 The work to be done consists of furnishing all materials, equipment, tools, supervision, labor and incidentals required to complete the above stated project. The work includes: Constructing ten (10) pedestrian curb ramps at various street intersection corners, including traffic control, demolition of existing surface improvements and patching, per the List of Ramp Locations (Exhibit A) Type C1 Curb Ramps per SDG-135 Type C2 Curb Ramps per SDG-135 Question Acceptance Deadline 02/28/2024 at 10:00 AM PT Questions are submitted online No All bidders shall direct their questions during the bidding period to the Engineering Department of Solana Beach at (858) 720-2470. General Requirements - Insurance Required - License Required - Prevailing Wage Required Bonding Requirements - Bid Bond 100 % - Performance Bond 100 % - Labor and Materials Bond 100 % -- A Performance Bond and Material and Labor Bond, both in amounts equal to 100% of the contract price for this project, in addition to the Bid Bond shall be obtained in accordance with the Contract and the Bid Documents. No bid will be received unless it is made on the proposal form furnished by the City. Each bid must be accompanied by cash, certified check, cashier's check or bidder's bond made payable to the City of Solana Beach for an amount equal to at least ten percent (10%) of the total amount of the bid. Time is of the essence in the performance of work under this contract. The contractor shall commence work within 14 calendar days after the date of written Notice to Proceed is issued by the CITY and to complete all work within 15 working days after the date of commencement of work. *The City reserves the right, after opening bids, to reject any or all bids, or to make award to the lowest responsible bidder and reject all other bids, and to waive any informality in the bidding. DVBE (3%)

Bid Results

Sidewalks / Parking Lot

$93,500.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
191
Active Projects
94
Bidding Soon
1,894
All Active Projects
845
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 29, 2024

April 1, 2024

img_map_placeholder

Multiple Locations, Solana Beach, CA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.