BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a multi-residential development in West Palm Beach, Florida. Completed plans call for the renovation of a multi-residential development.

PBCHA-IFB-2024-03 Recommended Mitigation Scope. Our proposed mitigation plan is summarized as follows: 1. Existing interior courtyard walkways - Demolition and removal. 2. Interior Courtyard - Remove sod and regrade. 3. Proposed interior Walkways - Construct as per sketch provided. 4. Interior green areas - Resod. 5. Existing OWS - Install proper size outlet drain. 6. Existing small elevator sump - Adjust float operation to shut off below floor level Detailed Scope of Work 1. Existing interior courtyard walkways. This includes the removal and off-site disposal of existing interior walkways as shown on the attached sketch. Safety barriers and site protection is included in this scope of work. Remove makeshift drainage pipes installed by maintenance in attempt to mitigate flooding 2. Interior Courtyard. This includes the removal of sod and excess materials from the area to be graded. Grading is intended to be away from the building, maintaining a positive slope towards the center of the interior courtyard and towards the street. Surface slope must not exceed 2% grade and prevent surface water retention. 3. Proposed interior Walkways. Interior walkways shall be four inch thick (4"), 3,000 psi minimum compressive strength concrete on a compacted non-organic soil base at the locations shown on the drawings. Walkways should match the surrounding grades, slope away from the buildings and cross slope in the overall drainage direction. Walkways adjacent to buildings are to be provided with an expansion joint along the building walls and provided with construction and control joints at five (5) feet maximum spacing. All walks shall have a broom, non-slip finish. 4. Interior green areas. All areas affected by the work shall be re-sodded. Sod shall match existing species and be free of invasive species. The finished sodded elevation shall not exceed the grades shown on the grading plan and maintain grading and drainage design intent. 5. Existing OWS. The existing outlet piping reducer and small diameter piping is to be replaced by extending the same diameter as the outlet to the exterior of the equipment room. 6. Existing elevator sump As described earlier, the sump pump control float is located above the elevator shaft floor and must be relocated or replaced to control the off level to be below finished floor. The Palm Beach County Housing Authority (PBCHA) acting for itself, instrumentalities and/or affiliates is soliciting proposals from qualified, licensed, and insured entities for a Firm FixedPrice contract to provide Flooding Mitigation Repairs at Dyson Circle Apartments located at4695 N Dyson Circle, West Palm Beach, FL 33415. All questions shall be submitted in writing five (5) days prior to closing to the attention of: LaQuavial Pace Contracts and Procurement Officer 3333 Forest Hill Blvd. West Palm Beach, FL 33406 procurement@pbchafl.org

Award

Multi-Residential

$49,300.00

Public - County

Renovation

4

5

2

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
281
Active Projects
136
Bidding Soon
1,936
All Active Projects
821
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 27, 2024

March 28, 2024

img_map_placeholder

4695 N Dyson Cir, West Palm Beach, FL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.