BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 11, 2024 at 8:00 PM

Updated April 12, 2024

Renovation of a fitness / recreation center in The Villages, Florida. Completed plans call for the renovation of a fitness / recreation center.

The Sumter Landing Community Development District is requesting bids from qualified firms for the HVAC Replacement at Seabreeze Recreation Center. If you have any questions regarding this ITB, please email or call Susi Belon at Susan.Belon@Districtgov.org 352-751-6700. The Sumter Landing Community Development District is requesting bids for HVAC Replacement at Seabreeze Recreation Center. Qualified firms wishing to respond for ITB #24B-015 HVAC Replacement at Seabreeze Recreation Center, must provide all labor, services, equipment, and materials described in this document, whether directly or through sub-contractors/sub-consultants. This does not, however, limit the use of sub- contractors or sub-consultants. The intent of this project is to procure a qualified, professional Contractor, with a minimum of 5 years of experience in providing HVAC mechanical installation as their primary services. These services are to consist of, but not limited to, HVAC removal and installation at all District property listed herein. Payment for services described herein shall be inclusive and final with no additional cost to the District. It is the intent of these specifications to describe a complete contract fully acceptable to the District. Even though certain details may have been unintentionally omitted, the Contractor shall nonetheless perform all work necessary to complete the project to the highest industry standards and acceptable to the District. Work on this project will begin upon the awarded Contractors receipt of Notice to Proceed. Completion is expected within 45 calendar days after the date specified in the Notice to Proceed. The successful Bidder/ Contractor upon receipt of notice to proceed shall immediately apply for all permits and diligently monitor the progress, to achieve swift acquisition of all permits. The time for permit acquisition shall not exceed 30 days and may be extended due to circumstances beyond the contractors control. The completion date may be extended due to unforeseen circumstances with the approval of the District. Question Deadline 02/14/2024 at 4:00 PM ET

Award

Fitness / Rec Centers

$367,414.00

Public - City

Renovation

9

7

42

7

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
388
Active Projects
171
Bidding Soon
2,344
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 29, 2024

April 1, 2024

Project location map

2384 Buena Vista Blvd, The Villages, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.