BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 8, 2024 at 7:00 PM

Updated March 9, 2024

Site work and paving for a sidewalk / parking lot in Newton, Illinois. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of February 20, 2024, this project has not yet been awarded. A timeline for award has not yet been established. The work on this section consists of the construction of concrete sidewalk, concrete driveway pavement, concrete curb and gutter, concrete driveway pavement and sidewalk removal and other incidental items. South Van Buren Street from Reynolds Street to Decatur Street. City/County City of Newton Removal and Replacement of Concrete Sidewalk, Curb and Gutter and Driveway Pavement on South Van Buren St. From Reynolds St. To Decatur St. In the City of Newton Involving; 104 Square Yards Portland Cement Concrete Driveway Pavement 6" 200 Foot Combination Concrete Curb and Gutter Removal and Replacement 2,177 Square Foot Portland Cement Concrete Sidewalk 4" 1,998 Square Foot Sidewalk Removal 105 Square Yards Driveway Pavement Removal 1 Lump Sum Traffic Control and Protection Standard 701611 1 Lump Sum Traffic Control and Protection Standard 701801 1 Each Remove Inlets Project Location: ILDOT - Removal and Replacement of Concrete Sidewalk, Curb and Gutter and Driveway Pavement on South Van Buren St

Award

Sidewalks / Parking Lot

$77,903.00

Public - City

Paving, Site Work

5

3

5

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
49
Bidding Soon
667
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2024

April 8, 2024

Project location map

S Van Buren St, Newton, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.