BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Bartonville, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of November 12, 2024, project is under construction. For the proposed project officially known as the Depot Street Roadway and Site Improvements and at which time said proposals will be publicly opened and read. The proposed improvement consists of earth excavation, seeding, PCC/HMA pavement, PCC curb and gutter, PCC sidewalk, street wall, landscaping, lighting, storm sewer, water main, traffic control, and all necessary adjustments, incidentals and appurtenances at locations shown in the plans. All provisions regarding EEO, prevailing wage, certified payroll, and DBE and WBE requirements shall be strictly enforced. All proposals must be accompanied by cash, certified check, cashiers check, or a bid bond for not less than five percent (5%) of the amount of the bid The successful bidder will be required to furnish a satisfactory Performance Bond for the full amount of the contract, with sureties, to be approved by the City Engineer. Before plans and specifications may be obtained, contractors must be pre-qualified. All provisions regarding EEO, prevailing wage, certified payroll, and DBE and WBE requirements shall be strictly enforced. The City of Peoria reserves the right to waive technicalities and to reject any or all proposals. This project is located along Depot Street and Oak Street where they intersect in the City of Peoria, Peoria County, IL. Construction activity consists of new pavement, parking lot construction, constructing new water main, PCC curb and gutters, sidewalks, drainage improvements, and landscaping. The project will be completed in 3 phases. Phase 1 will include Depot Street and the adjacent parking lot. Phase 2 will include Oak Street. Phase 3 will consist of the intersection of Depot & Oak Streets.

Under Construction

Sidewalks / Parking Lot

$9,550,000.00

Public - City

Paving, Site Work

124

19

30

5

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
36
Bidding Soon
519
All Active Projects
222
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 22, 2024

May 20, 2024

img_map_placeholder

Depot St, Bartonville, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.