Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Winnipeg, Manitoba. Working plans call for the renovation of a educational facility.
Renovation of the main south entrance to the Arch 2 Building. The scope of work will include addressing and modifying the current building envelope for the replacement of the existing canopy; Replacing the podium and stairs, including tactile warning strips and non-slip nosings; Structural solution for new design; Removal of ext. light standard; Landscaping and new ramped sidewalk; Removal of existing trees and shrubs; New guards and handrails; Removal and reinstallation of condensing unit; New exterior lighting solution; Remove three (3) existing canopy lights; Replace six (6) exterior wall pack lights; Replace storefronts and doors; Replace three (3) Precast panels; Install visibility strips on glazing; Include automatic door operators and door hardware; Replace impacted caulking and backer rod. TIMELINE: Detailed design is complete. Construction documents to be completed by the end of 2024. Tender expected to be issued January 2025.
Final Planning
Educational
$575,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
1
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 26, 2025
56 Curry Pl, Winnipeg, MB
Related To This Project
Winnipeg, MB
Bid Date: Feb 15 2024
Winnipeg, MB
--
Winnipeg, MB
Bid Date: Feb 14 2024
Winnipeg, MB
Bid Date: Feb 14 2024
Winnipeg, MB
Bid Date: Mar 08 2024
Winnipeg, MB
Bid Date: Feb 28 2024
Winnipeg, MB
--
Winnipeg, MB
Bid Date: May 23 2024
Winnipeg, MB
Bid Date: Feb 23 2024
Winnipeg, MB
Bid Date: Feb 13 2024
Winnipeg, MB
Bid Date: Feb 27 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.