BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a playground / park / athletic field in Lake in the Hills, Illinois. Completed plans call for site work for a playground / park / athletic field.

The Village of Lake in the Hills Public Properties Department has issued a Request for Proposal for the Nockles Park Pier Replacement. ADDENDUM*** Posted on January 30, 2024- If you are interested in reviewing the full Request for Proposal packet, please login or create a new user account below and then select the link for "Add me to Planholder List for the Bid/RFP". Questions All RFP related/affiliated questions must be asked through the website. You will need to be a registered a Planholder to post a question. Questions are due by 2/12/2024 to receive a response for the Nockles Park Pier Replacement RFP prior to Bid Opening. The Village of Lake in the Hills ("Village") is seeking the services of a Contractor to furnish all labor, equipment, tools, materials, and anything necessary to remove both existing Nockels Piers(145 Hilltop, Lake in the Hills, IL, 60156) and replace with 2 (two) new modular floating piers made of high-density polyethylene materials (and other materials identified herein). The installation shall be conducted in a professional manner, completed within the specified time frame, and located in the same location as the original. The Contractor shall deliver all materials to the site and proceed with the installation, referencing the attached pictures 1 & 2 below, which show the estimated size and quantities of the new pier. (The contractor is responsible for field verifying the site to ensure the accuracy of the estimated replacement pier sizes and dimensions. o Please note that one of the existing fishing piers containstwo benches and railings; where theContractor will be required to furnish any new benches for this project. The other pier just contains boat tie rope cleats. o When constructing the new piers, the pilings shall be driven into the lake bed to the depth that is required to stabilize the pier properly. o The Contractor shall follow all the manufacturer's recommended installation procedures for all the products used in this project. o The Contractor is solely responsible for construction means, methods, techniques, sequences, and procedures and for safety precautions and programs. o The Contractor shall remove and dispose of the existing fishing and boat pier and all associated hardware. o The Contractor is responsible for cleaning up the work site daily by removing all work-related debris. o The Contractor isresponsible for repairing any ruts or any other damage caused during the execution of this contract. Any damage caused by the Contractor during the term of this contract shall be repaired at the sole expense of the Contractor within ten (10) days of the damage. o The Contractor shall notify the Project Manager one week before the start of construction. o The Construction hours are limited to 7:00 a.m. to 7:00 p.m. Monday through Friday unless otherwise authorized by the Village. No work is allowed on Saturday or Sunday unless authorized by the Village's project manager. o The vendor will provide all associated documents for warranty, maintenance, and parts listings

Post-Bid

Playgrounds / Parks / Athletic Fields

$370,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
196
Active Projects
125
Bidding Soon
2,188
All Active Projects
952
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2024

March 21, 2024

img_map_placeholder

147 Hilltop Dr, Lake in the Hills, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.