Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Saint Paul, Minnesota. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; transportation facility; and transportation facility.
This project provides for: 2024 Parking Structure Rehabilitation includes miscellaneous repairs and maintenance to the parking structure facilities at Terminal 1 and Terminal 2 at the Minneapolis-St. Paul International Airport. The work includes miscellaneous concrete repairs, expansion joint replacement, construction joint rehabilitation, water repellant application, traffic coating application, floor drain replacement, parking stall striping, ADA stall modifications, miscellaneous plumbing repairs, miscellaneous electrical work, and repairs and maintenance to the railings located within the parking structure facilities at Terminal 1; the railing work includes removing existing railings from the parking structure, installing temporary fencing, blasting and repainting railings at an off-site facility, steel fabrications, blasting and repainting railing posts and other sections in place, and reinstalling the railings. Consistent with Minnesota Statute, Section 473.144, MAC may not accept a bid or proposal for a contract or execute a contract in excess of $100,000 with any business unless said business is in compliance with certain requirements concerning affirmative action plans. Evidence of compliance must be submitted within (1) one MAC business day following opening of bids. Bids will be considered non-responsive if the compliance requirements are not met. Compliance requirements are outlined in the project specification. The goal of the MAC for the utilization of Targeted Group Businesses on this project is 11%. Each bid shall be accompanied by a "Bid Security" in the form of a certified check made payable to the MAC in the amount of not less than five percent (5%) of the total bid, or a surety bond in the same amount, running to the MAC, with the surety company thereon duly authorized to do business in the State of Minnesota. Such Bid Security to be a guarantee that the bidder will not, without the consent of the MAC, withdraw its bid for a period of (70) days after the opening of bids, and, if awarded the Contract, will enter into a contract with the MAC, and in connection therewith, give Performance and Payment Bonds as required by law and on forms furnished to the Contractor by the MAC. In the event the Bidder fails to enter into a Contract, the amount of the certified check will be retained or the bond enforced by the MAC. The Bid Security of the three (3) lowest bidders will be retained until the contract is executed, but in no event longer than (70) days. The Bid Security of the lowest responsible bidder shall be retained in any event until the contract is executed and Payment and Performance Bonds furnished as herein provided.
Bid Results
Sidewalks / Parking Lot
$4,145,328.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 15, 2024
April 29, 2024
4300 Glumack Dr, Saint Paul, MN
Related To This Project
Saint Paul, MN
Bid Date: Mar 05 2024
Saint Paul, MN
Bid Date: Feb 27 2024
Saint Paul, MN
Bid Date: Feb 21 2024
Saint Paul, MN
Bid Date: Mar 05 2024
Saint Paul, MN
Bid Date: Feb 22 2024
Saint Paul, MN
Bid Date: Feb 28 2024
Saint Paul, MN
Bid Date: Apr 19 2021
Saint Paul, MN
Bid Date: May 10 2021
Saint Paul, MN
Bid Date: Aug 23 2024
Saint Paul, MN
Bid Date: Jun 11 2024
Saint Paul, MN
Bid Date: Feb 07 2024
Saint Paul, MN
--
Saint Paul, MN
--
Saint Paul, MN
Bid Date: Jan 31 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.