Site work for a road / highway in Lawrenceville, Georgia. Completed plans call for site work for a road / highway.
The work to be performed by the Contractor consists of but is not limited to the following: This project will consist of installing approximately 2,058 feet of 4-inch steel and 2,080 feet of 4-inch PE. at the locations listed below. *Note: These locations and quantities are subject to change but will be of similar scope. This will be a line item bid with a not to exceed total. o Ozora Church Rd and Hwy 81- Install approximately 2,058 feet of 4-inch steel main. o Ozora Church Rd and Hwy 81. - Install approximately 2,080 feet of 4-inch PE. Questions regarding bids should be directed to Steve Murray, Purchaing Director, at steve.murray@lawrencevillega.org, no later than 3:00 P.M. on February 19, 2024. Bids are legal and binding upon the bidder when submitted. Bids in the case of Corporations not chartered in Georgia, must be accompanied by proper certification stating that said Corporation is authorized to do business in the State of Georgia. No Bidder may withdraw his Bid within ninety (90) days after the actual date of the opening thereof. Bidder agrees to complete the Contract awarded within the "allowable calendar days for completion" from the date of the "Notice to Proceed". All bonds must be submitted on forms provided by the City of Lawrenceville and agencies providing bonds and insurance should provide proof that they meet the criteria outlined in the bid and contract documents. The City of Lawrenceville does not discriminate on the basis of disability in the admission or access to its programs or activities. The written Bid Documents supersede any prior verbal or written communications between the parties. Award will be made to the contractor submitting the lowest responsive and responsible bid. The City of Lawrenceville reserves the right to reject any or all bids to waive technicalities and to make an award deemed in its best interest. Bids may be split or awarded in entirety. All companies submitting a bid will be notified in writing of award. Scope of Work This project will consist of installing approximately 2,058 feet of 4 inch steel and 2,080 feet of 4 inch PE. *Note: These locations and quantities are subject to change but will be of similar scope. This will be a line item bid with a not to exceed total. o Ozora Church Rd and Hwy 81- Install approximately 2,058 feet of 4 inch Steel main. o Ozora Church Rd and Hwy 81. - Install approximately 2,080 feet of 4 inch PE o All materials will be supplied by the City of Lawrenceville Requirements of Contractor o Pig all mains. o Test all plastic mains at a minimum of 100 psi for 24 hours. o Test all plastic service lines at a minimum of 100 psi for 10 mins. o Test all steel lines at 750 psi for 24 hours. o All steel lines will be jeeped according to City standards. o All weld joints will be coated with f1 2-part epoxy according to manufacturer's standards. o All coating defects will be repaired according to manufacturer's standards. o As- built plans and complete list of all materials and serial numbers and/or lot numbers and date manufactured will be provided during or at the end of the project. A Gas System Inspector must sign off that this has been received, before payment is rendered. o Landscaping shall be restored to the same or better condition than found. o Any replacement of gravel or hard surface is the responsibility of the Contractor and shall be restored to the same or better condition than found. o All work will be completed in accordance with manufacturer's and City of Lawrenceville's standards and procedures. Information o Any changes to the plan must be approved by the Gas System Inspector. o Any rock must be verified by a Gas System Inspector to be paid. *Bore rock will only be paid if the use of a pneumatic air or mud motor is required. o A Gas System Inspector must be present and sign off on all test charts. o All as-built plans, manufacturer material information and test records must be submitted in paper and in PDF electronic form. These must be in an acceptable template and approved before submission (i.e. permanent tie-down locations, measurements, drawings, etc.) o All materials will be procured by the City of Lawrenceville. The contractor will be responsible for scheduling and handling of all materials. Scope of Work This project will consist of installing approximately 2,058 feet of 4 inch steel and 2,080 feet of 4 inch PE. *Note: These locations and quantities are subject to change but will be of similar scope. This will be a line item bid with a not to exceed total. o Ozora Church Rd and Hwy 81- Install approximately 2,058 feet of 4 inch Steel main. o Ozora Church Rd and Hwy 81. - Install approximately 2,080 feet of 4 inch PE o All materials will be supplied by the City of Lawrenceville Requirements of Contractor o Pig all mains. o Test all plastic mains at a minimum of 100 psi for 24 hours. o Test all plastic service lines at a minimum of 100 psi for 10 mins. o Test all steel lines at 750 psi for 24 hours. o All steel lines will be jeeped according to City standards. o All weld joints will be coated with f1 2-part epoxy according to manufacturer's standards. o All coating defects will be repaired according to manufacturer's standards. o As- built plans and complete list of all materials and serial numbers and/or lot numbers and date manufactured will be provided during or at the end of the project. A Gas System Inspector must sign off that this has been received, before payment is rendered. o Landscaping shall be restored to the same or better condition than found. o Any replacement of gravel or hard surface is the responsibility of the Contractor and shall be restored to the same or better condition than found. o All work will be completed in accordance with manufacturer's and City of Lawrenceville's standards and procedures. Information o Any changes to the plan must be approved by the Gas System Inspector. o Any rock must be verified by a Gas System Inspector to be paid. *Bore rock will only be paid if the use of a pneumatic air or mud motor is required. o A Gas System Inspector must be present and sign off on all test charts. o All as-built plans, manufacturer material information and test records must be submitted in paper and in PDF electronic form. These must be in an acceptable template and approved before submission (i.e. permanent tie-down locations, measurements, drawings, etc.) o All materials will be procured by the City of Lawrenceville. The contractor will be responsible for scheduling and handling of all materials.
Post-Bid
Roads / Highways
$450,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Sign-up for Instant Access.
Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
February 29, 2024
March 29, 2024
September 25, 2024
Ozora Church Rd, Lawrenceville, GA
Related To This Project
Lawrenceville, GA
Bid Date: Mar 05 2024
Lawrenceville, GA
Bid Date: Feb 21 2024
Lawrenceville, GA
Bid Date: Feb 28 2024
Lawrenceville, GA
Bid Date: Feb 22 2024
Lawrenceville, GA
Bid Date: Feb 26 2024
Lawrenceville, GA
Bid Date: Mar 06 2024
Lawrenceville, GA
Bid Date: Feb 21 2024
Lawrenceville, GA
Bid Date: Nov 05 2020
Lawrenceville, GA
Bid Date: Aug 05 2024
Lawrenceville, GA
Bid Date: Feb 21 2024
Lawrenceville, GA
Bid Date: Jun 21 2024
Lawrenceville, GA
--
Lawrenceville, GA
Bid Date: Mar 13 2020
Lawrenceville, GA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--