BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 13, 2024 at 7:00 PM

Updated February 14, 2024

Site work for a water / sewer project in Saint Marys, Pennsylvania. Completed plans call for site work for a water / sewer project.

Vine Road Phase II Waterline No Bid May Be Withdrawn for a Period of Sixty (60) Days After the Time of the Opening of the Bids. Bidders Shall Submit an E-verify Program Verification in Compliance With the Public Works Employment Verification Act 127 of 2012. Bidder's Surety a Certified Check Made Payable to the St. Marys Area Water Authority, or a Bid Bond on the Bid Form Executed by the Bidder and a Surety Company Approved by the Owner, in an Amount Equal to Ten Percent (10%) of the Total Amount of Bid, Must Be Submitted With Each Bid or Bids Will Be Considered Nonresponsive and Immediately Rejected. Successful Bidding Bidder Awarded This Contract Shall Provide a Performance Surety in the Amount of One Hundred Percent (100%) of the Contract Amount. Equal Opportunity Employer - St. Marys Area Water Authority Fully Complies With the Provisions of This Act. All Qualified Bidders Are Invited to Submit a Proposal. The St. Marys Area Water Authority Board Reserves the Right to Award or to Reject Any and/or All Portions Thereof Proposals Submitted, and to Waive Informalities in the Bidding Process if in the Best Interest of the Authority. Questions Due Date: Feb 1st 2024, 4:00 PM EST Online Portal Equipment and Services to be provided shall be according to the Specifications which are on file at the office of KLH Engineers, Inc., 5173 Campbells Run Road, Pittsburgh, Pennsylvania, 15205, and at the office of the St. Marys Area Water Authority, 967 State Street, St. Marys, PA 15857 The Work under Contract No. 2024-03 generally consists of construction of approximately 4,552 lineal feet of 12-inch diameter Ductile Iron water main, 145 lineal feet of 8-inch Ductile Iron water main, and appurtenances. Work under Contract No. 2024-03 covers the furnishing of all labor, material, plant, equipment, utilities, and services required for water main construction including pipe, fittings, valves, joint restraints, hydrants, services, backfill, and other accessories and appurtenances in the quantities and locations specified and shown on the Contract Documents. The water main shall be installed via the methods specified or shown on the Contract Drawings. The Work also includes all hydrostatic and bacteria testing, disinfection, reconnection and/or replacement of services, and all restoration Work as specified and shown on the Contract Drawings.

Bid Results

Water / Sewer

$738,022.00

Public - City

Site Work

27

8

4

4

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
175
Active Projects
88
Bidding Soon
1,056
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 8, 2024

March 11, 2024

Project location map

Vine Rd, Saint Marys, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.