BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 15, 2024 at 8:00 PM

Updated October 31, 2024

Site work for a civil project in Rocky Mountain House, Alberta. Completed plans call for site work for a bridge / tunnel; and road / highway.

BRIDGE CULVERT REPLACEMENT AND OTHER WORK 752:04 - BF 08098 - Carrying Hwy 752 over a Tributary to North Saskatcheawan River, Rocky Mountain House, Alberta CENTRAL REGION APPROXIMATE QUANTITIES 3 200 cubic metres Excavation 44 metres 2 700 mm Dia. SPCSP 825 cubic metres Backfill - Granular 140 tonnes Asphalt Concrete Pavement - Mix Type M1 (PG58-28) 2 325 cubic metres Backfill - Non-Granular 110 cubic metres Heavy Rock Riprap Contractor to supply all materials. Question Deadline 02/23/2024

Award

Bridges / Tunnels

$1,135,860.00

Public - State/Provincial

Site Work

11

11

10

8

Subscribe For Documents

99 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
2
Bidding Soon
94
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2024

April 15, 2024

Project location map

AB-752, Rocky Mountain House, AB

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.