BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, new construction, renovation and addition to a mixed-use development in Providence, Rhode Island. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the construction of a educational facility; for site work for a educational facility; and for the renovation of a educational facility.

Reference Number 0000341294 The City is requesting proposals using the scope of work outlined in the bid solicitation documents (included herein) for Design Build services to facilitate the construction of three school projects, New or Hybrid (new & partial renovations) Mount Pleasant High School, and two (2) New PreK -8 Schools Providence, RI. In addition, the existing school may be demolished with the students being transferred to a swing space in order to facilitate the project. Locations: Mt. Pleasant High School - 434 Mt Pleasant Avenue, Providence, RI 02908 Gilbert Stuart School - 188 Princeton Avenue, Providence, RI 02907 Asa Messer School - 1655 Westminster Street, Providence, RI 02909 Deadline for questions submissions: 03/04/2024 at 12:00 PM ET Please direct questions relative to the Minority and Women's Business Enterprise Program and the corresponding forms (Pages 9-13) to the MBE/WBE Outreach Director for the City of Providence, Grace Diaz Email: gdiaz@providenceri.gov The City is requesting proposals using the scope of work outlined in the bid solicitation documents (included herein) for Design Build services to facilitate the construction of three school projects, New or Hybrid (new & partial renovations) Mount Pleasant High School, and two (2) New PreK -8 Schools Providence, RI. In addition, the existing school may be demolished with the students being transferred to a swing space in order to facilitate the project. By performing all necessary or advisable preconstruction and construction work, complete the Project and assist the City of Providence, Providence Public School District, and the Owners Project Manager (Downes) and their consultants as required to obtain substantial completion of the new Design Build (DB) service for three school projects, New or Hybrid (new & partial renovations) Mount Pleasant High School, and two (2) New PreK-8 Schools by May of 2027. MBE Goal is Ten Percent (10%) and the WBE Goal is Ten Percent (10%) per State regulations and applicable law. The City encourages the engagement and hiring of local residents and businesses at the company, trade worker, vendor, and supplier levels. The projects have obtained Stage II approval from RIDE. The objective is for the Design Builder to provide support throughout the remaining design process and RIDE submissions. The overall project budget, including all soft costs (A/E, OPM, Commissioning, HazMat, etc.) and hazmat remediation, is: 1. Mt Pleasant HS $110,000,000 with an estimated construction budget of $90.5 Million. 2. New Prek-8 #1 $62,050,000 with an estimated construction budget of $51.5 Million. 3. New Prek-8 #2 $62,050,000 with an estimated construction budget of $51.5 Million. Note- o The Proposer shall submit their completed response in HARD COPY (1 original, 2 copies) format plus a single PDF file on thumb drive. Item Description and the City Department to which the solicitation and bid are related and must include the company name and address on the envelope (On page 1) o If required by the Department, please keep the original bid bond and check in only one of the envelopes. o Communications to the Board of Contract and Supply that are not competitive sealed bids (i.e. product information/samples) should have "NOT A BID" written on the envelope or wrapper. o Only use form versions and templates included in this solicitation. If you have an old version of a form do not recycle it for use in this bid. o The bid envelope and information relative to the bid must be addressed to: Board of Contract and Supply Department of the City Clerk - City Hall, Room 311 25 Dorrance Street Providence, RI 02903 Project Specific Scope of work; included but not limited to: o Construction of a 2 new PK-8 Schools and a New or Hybrid Mt Pleasant High School. o Demolition and abatement o Sitework, site improvements and landscaping o Structural systems; foundations, building structures etc o Building envelope systems o MEP systems, including fire alarm o Security systems o Interior finishes o Conveying systems o Furnishings o Food service equipment o Furniture and Technology o Reviews with the Providence Building and Fire Departments and procurement of permits o Develop project budget(s); provide control budget and estimates at schematic design, design development and construction documents o Provide Guaranteed Maximum Price (GMP) at issuance of construction documents or earlier o Preconstruction services to additionally include identifying and procurement of long lead items and the early procurement of selected trades o Assist design team in the development of logistics planning, constructability, early procurement, identification of supply chain issues and budgeting/value engineering o The city of Providence waives the building permit fees; ADA fee is the responsibility of the DB

Award

Educational

$1,193,000.00

Public - City

Addition, Demolition, New Construction, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

59 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
395
Active Projects
249
Bidding Soon
2,980
All Active Projects
1,367
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2024

November 25, 2024

img_map_placeholder

Multiple Locations, Providence, RI


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.