BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 16, 2024 at 7:00 PM

Updated February 17, 2024

Site work for a playground / park / athletic field in Beverly, Massachusetts. Completed plans call for site work for a playground / park / athletic field.

The City of Beverly is seeking quotes for the reconditioning of ten clay tennis courts at the Beverly Golf & Tennis Club located at 134 McKay Street, Beverly, MA 01915. The courts are reconditioned on an annual basis. The work is anticipated to start the last week of April and is generally completed in 4 days Recondition Clay Tennis Courts after winter shutdown including: removing leaves and debris, adding material to level courts, water and roll courts, install new marking tapes set up and adjust nets. The work consists of the following: 1- Clean surfaces of debris and power blow all loose dead material from surfaces and remove to an on site location. 2- Scarify and groom court surfaces filling in any depressions as necessary with Har-Tru material. 3- Provide, apply and level out 15 pallets of Har-Tru to surfaces, (total 21 tons). 4- Water and roll court surfaces. 5 -Lay out and nail 10 sets of new marking tapes with new 2-1/2" aluminum nails. 6- Roll tapes into court with power roller. 7- Set up and adjust nets, center anchors etc. per order of tennis courts manager..

Post-Bid

Playgrounds / Parks / Athletic Fields

$70,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
490
Active Projects
187
Bidding Soon
3,704
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2024

April 30, 2024

Project location map

134 McKay St, Beverly, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.