BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, new construction and renovation of a mixed-use development in Orland Park, Illinois. Completed plans call for the construction of a municipal facility; for site work for a municipal facility; for the renovation of a playground / park / athletic field; pre-engineered storage facility; and pre-engineered storage facility.

**As of April 10,2024 project was awarded to Krause Construction Inc., awarded amount is $2,890,871.64.** Athletics Operations Maintenance Facility Project Reference Number 0000340709 The Village of Orland Park ("Village") is requesting proposals for the construction of the Athletics Operations Maintenance Facility located at 14671 West Ave, Orland Park IL 60462. In addition to the construction of the new Athletics Operations Maintenance Facility (Building #1), this project also includes the renovation of the existing Parks Administration building (Building #2), and the construction of a new storage building (Building #3), as detailed in the project Exhibits. ("Project"). Question Deadline 02/09/2024 at 2:00 PM CT Questions are submitted online Yes, All questions related to this proposal must be submitted online . General Requirements - Insurance Required - Prevailing Wage Required Each proposal must be accompanied by a proposal deposit, as earnest money, in the form of a bid bond, a certified check or cashier's check, drawn on a responsible bank, made payable to the Village of Orland Park for ten percent (10%) of the total amount of the proposal price. The Work consists of: 1. Building #1 = New Pre-Engineered Steel Building, 4,146 sq ft. New construction including Mechanical Mezzanine, site work, new utilities, brick façade and interior build out. 2. Building #2 = Interior remodeling at existing one-story administration building. Work includes but not limited to selective demolition, drywall patching, painting and electrical relocation. 3. Building #3 = New wood framed one story accessory garage, brick facades and site work. 8The Village Reserves the Right to Reject Any and All Proposals and to Waive Any Irregularities. Question Deadline 02/09/2024 at 2:00 PM CT Questions are submitted online Yes, All questions related to this proposal must be submitted online .

Award

Municipal

$2,890,872.00

Public - City

New Construction, Renovation, Site Work

48

28

19

5

Subscribe For Documents

79 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
172
Active Projects
88
Bidding Soon
1,727
All Active Projects
755
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 29, 2024

April 1, 2024

img_map_placeholder

14671 West Ave, Orland Park, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.