Published March 13, 2024 at 8:00 PM

Updated March 14, 2024

Demolition, site work and paving for a mixed-use development in Appleton, Wisconsin. Completed plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; for the demolition of a playground / park / athletic field; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.

A. Project Title: Highview Park - Trail Redevelopment Project B. Owners Name: City of Appleton; Parks, Recreation and Facilities Management Department. C. Consultants Name: Rettler Corporation D. In general, the Project consists of the following Work 1. Base Bid - Work of this proposed Contract comprises site improvements with work including, but not limited to, site demolition, tree removals, clearing, and grubbing, site security and safety, common excavation, finish grading, topsoil preparation, landscape restoration, and erosion control. E. Project Schedule: 1. Contractor shall submit a project schedule with a site plan showing proposed phasing, dates, and times for all work a minimum of ten (10) days prior to the initial start of Work. Schedule must be approved by the Owner's Operations Department and the Consultant. Highview Park - Milestone Dates Start Work - April 1, 2024 Substantial Completion - July 3, 2024 Final Completion - July 10, 2024 2. Contractor agrees that Work shall be conducted regularly, diligently, and uninterruptedly at such a rate of progress as will ensure completion by the date specified. 3. The milestones set forth shall be part of the contract agreement. Liquidated damages apply if milestones are not met. 4. It is expressively understood and agreed, by and between the Contractor and the Owner, that the timeframe for completion of this Work, as described herein, is a reasonable time for climatic range and usual industrial conditions prevailing in this locality. Work consists of erosion control, site demolition, general grading, finish grading, base course, hot mix asphalt, concrete paving, and landscape restoration for the Highview Park Trail. Site Address: North Brookshire Dr. to N. Meade St. City: Appleton County: Outagamie State/Province: WI Site Directions: West of Meade Street, south of I-41, and north of Capital Drive Paving (Trail Paving), Landscaping - Seeding, Sitework/Excavating and Grading, Erosion Control - Temporary Est. Completion Date: Sept. 16, 2024

Award

Playgrounds / Parks / Athletic Fields

$149,212.00

Public - City

Demolition, Paving, Site Work

7

15

4

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
42
Bidding Soon
647
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2024

April 1, 2024

Project location map

110 E Wayfarer Ln, Appleton, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.