Site work and paving for a civil project in Monroe, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

As of March 15, 2024 project was awarded to Absolute Solutions Inc., awarded amount is $730,359.87. Questions regarding this Project may be directed only to Jammi Guion, Supervisor Construction Documents Coordinator, City of Monroe, Phone (360) 863-4514, Email: PWContracts@monroewa.gov. Questions received after Monday, February 12, 2024, at 5:00 p.m. (2 full business days) may not be considered. Site Address: 180th Avenue SE City: Monroe County: Snohomish State/Province: WA Site Directions: From Everett I-5, east on US2, right on 179th Avenue SE, left on 149th Street SE. The project area begins at the Intersection of 149th Street SE and 180th Avenue SE. Traveling south on 180th Avenue SE to the intersection of 150th Place SE, turn on 150th Place SE and continue to 181st Avenue SE. Turn north on 181st Avenue to 149th Street SE, turn east on 149th Street SE to the intersection of 180th Avenue SE. Est. Value: $ 1,083,000.00 Est. Completion Date: June 30, 2024 Bid Proposals received after the deadline stated above will not be opened or considered. Subcontractor lists must be submitted within the deadline listed on the forms. This Contract provides for the replacement of an existing water main that will follow the alignment of 180th Ave. SE, 181st Ave. SE, 182nd Ave. SE, 150th St. SE and 149th St. SE. The project will abandon-in-place the existing 8-inch asbestos cement water main and construct 2,800 LF of 8-inch ductile iron water main and associated assemblies, fittings, valves, meters, and service lines. The anticipated work includes removal and replacement of roadway pavement, trenching, placement of Hot Mix Asphalt (HMA Cl. 1/2 in. PG 58-22), utility adjustments, temporary traffic control, property restoration, and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications. All Bid Proposals must be submitted on the forms furnished in the Contract Provisions, and each must be accompanied by a certified check, cashiers, or bid bond made payable to the City of Monroe in an amount not less than five percent (5%) of the total bid including sales tax.

Award

Water / Sewer

$730,360.00

Public - City

Paving, Site Work

8

6

6

4

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
30
Bidding Soon
894
All Active Projects
370
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2024

April 15, 2024

img_map_placeholder

180th Ave SE, Monroe, WA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.