BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Florissant, Missouri. Completed plans call for site work for a educational facility.

Hazelwood School District is requesting bids for replacing pipe insulation, parts, and installation at various schools and in various size pipes. Here is a list of the pipe sizes at each school. The insulation must be covered with a PVC jacket as well. Any questions regarding the specifications are to be directed to Danielle Thomas, Director of Purchasing & Supplier Diversity no later than February 2, 2024 at 12:00p.m. Only these inquiries will be answered. Any items requiring clarification will be distributed to all known vendors. he Hazelwood School District is not responsible for late or incorrect proposals. The Hazelwood School District reserves the right to accept or reject any and all proposals. The Hazelwood School District reserves the right to award all or part of the bid solicitation to multiple bidders based on which proposal and/or proposals are most beneficial for the District. Once the Hazelwood School District has awarded the Proposal, the Proposal Submission will represent as the contractual agreement unless otherwise communicated. A.The Owner will prepare and forward to the successful bidder, the required copies of the contract. Bidders shall return properly executed prescribed copies of contract along with all required certificates of insurance, bonds, etc., required by these documents to the Owner within seven (7) working days after their receipt. A.The owner reserves the right to waive informalities in bids and to reject any or all bids. XIII.Wage Rates A.Prevailing wage rates for the St. Louis area shall apply to this work project. Prevailing wage rates will be supplied to the successful bidder. The successful bidder will have to comply in full with all requirements of the Prevailing Wage Law. B.Copies of the contractor's payroll may have to be furnished to the owner. C.The contractor will have to supply the necessary affidavit of compliance prior to receiving payment. D.The contractor will forfeit as a penalty to Hazelwood School District, ten dollars ($10) for each worker employed, for each calendar day, or portion thereof, such worker is paid less than the said stipulated rates for any work done under a said contract, by the contractor or by any subcontractor under them. E.All contractors' bonds will include such provisions as will guarantee the faithful performance of the prevailing hourly wage clause as provided by contract.

Post-Bid

Water / Sewer

$150,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
30
Bidding Soon
817
All Active Projects
330
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 22, 2024

March 22, 2024

img_map_placeholder

Multiple Locations, Florissant, MO

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.