Site work and paving for a mixed-use development in Vermillion, South Dakota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of March 7, 2024, project was awarded to D&G Concrete Construction, in the amount of $4,521,794.06.** The major quantities for the bid alternate are Deduct 439 CuYd of Placing Stockpiled Topsoil; Deduct 285 Lb of Seeding Boulevard Mix; Deduct 313 Lb of Fertilizing; Deduct 1 Ton of Hydro-Mulching; 43,286 SqFt of Cement Treated Subgrade; 137 Ton of Portland Cement; 1083 LF of 6 Watermain; 4 EA of 6 MJ Gate Valve & Box W/Joint Restraints; 2 EA of 6" MJ Bend (45 Degree) W/Joint Restraints; 1 EA of 6 MJ Plug W/Joint Restraints; 3 EA of 6x6 MJ Tee W/Joint Restraints; 2 EA of 6 Foster Adapter; 1 EA of Cut & Tie To Existing Watermain; 19 EA of 6x1 Water Service Saddle Tap & Corp; 19 EA of 1 Water Service Curb Stop & Box; 466 LF of 1 Water Service Piping; 1549 LF of Tracer Wire Water; 2 EA of Fire Hydrant W/Joint Restraints; 627 LF of 4 Dia Gravity Sewer Pipe; 119 LF of 8 Dia Gravity Sewer Pipe; 613 LF of 10 Dia Gravity Sewer Pipe; 1 EA of 8x4 Sanitary Sewer Service Connection; 18 EA of 10x4 Sanitary Sewer Service Connection; 3 EA of 48 Dia Sanitary Sewer Manhole; 19 EA of 4 Sanitary Clean Out; 1 VF of Additional Vertical Feet Manhole; 3 EA of Adjustment of Manhole & Cover; 1359 LF of Tracer Wire Sanitary; 1920 Ton of Base Course; 192 Ton of Subbase Foundation Aggregate; 192 Ton of Subbase Foundation Aggregate; 3989 SqYd of 8 PCC Pavement; 3230 EA of Dowel Bar Assembly; 2112 LF of Concrete Curb & Gutter; 10558 SqFt of 4 Concrete Sidewalk. All bids must be accompanied by a Bid security. Bid security will take the form of a bid bond in an amount of ten percent (10%) of the Bidder's maximum Bid price or a cashier's or certified check made payable to Owner in an amount of five percent (5%) of the Bidder's maximum Bid price. The Bidder to whom the contract is awarded will be required to furnish a construction performance bond and a construction payment bond to the Owner in the amount of one hundred percent (100%) of the contract award for each bond, in conformance with the requirements of the Contract Documents. The construction performance bond and construction payment bond shall remain in full force until the completion of the Contract as specified in the General Conditions. Upon request, in accordance with South Dakota Codified Law 5-18B-1, one paper copy of Bidding Documents shall be furnished, without charge, to each prime contractor resident in South Dakota who intends, in good faith, to submit a bid to the Owner. Additionally, if a paper copy is provided under the conditions of SDCL 5- 18B-1, in consideration of the documents being provided at no charge, unsuccessful bidders agree to return the documents to the Issuing Office within thirty (30) days after the bid opening. The Bid security will be retained by the Owner as liquidated damages if the successful bidder refuses or fails to enter into an Agreement within fifteen (15) days after Notice of Award or fails at time of executing the contract to furnish a construction performance bond and construction payment bond guaranteeing the faithful performance of the work. Bids may not be withdrawn after the time fixed for opening them. The Owner reserves the right to reject any and all bids, and to waive any irregularities therein. A pre-bid conference will not be held. (a) Bidders on this work will be required to comply with Title 40 CFR 33 and Executive Order 12138 (WBE). The goals and other requirements for Bidders and Contractors under this regulation which concerns utilization of Disadvantaged/Minority Business Enterprises (DBE/MBE) and Womens Business Enterprises (WBE) are explained in the Specifications. The MBE goal for this project is 1% of the total dollar value of the job while the WBE goal is 4% of the total dollar value of the job. (b) Bidders on this work will be required to comply with the President's Executive Orders Nos. 11246 (Equal Employment) as amended, 11518 (Small Business Concerns), and 11625 (MBE) as amended. The requirements for Bidders and Contractors under these orders are explained in the Specifications. (c) The goal for female utilization which shall be included in all federal and federally assisted construction contracts and subcontracts in excess of $10,000 shall be 6.9%. The goal for disadvantaged/minority utilization which shall be included in all federal and federally assisted construction contracts and subcontracts in excess of $10,000 shall be 1.2%. The goals are applicable to the Contractor's aggregate on-site construction workforce whether or not part of that workforce is performing work on a federal and federally assisted contract or subcontract.

Award

Roads / Highways

$4,521,794.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
15
Bidding Soon
227
All Active Projects
116
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 21, 2024

May 6, 2024

img_map_placeholder

Multiple Locations, Vermillion, SD

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.