BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of an educational facility in Stockton, California. Completed plans call for the renovation of a educational facility.

Stockton Unified School District ("District") is seeking proposals from qualified persons, firms, partnerships, corporations, associations, or professional organizations to provide constructability review, value engineering, master scheduling, cost estimating, budgeting, and construction services for the development and construction for the [Name of] Project ("Project"), in accordance with the lease-leaseback structure set forth in Education Code section 17406 et seq. Install split HVAC system, Piping, and Electrical as shown on the approved documents and Specifications. Completion Date: August 1, 2024 Project Estimate: $2,348,039.02 Questions regarding this RFQ/P may be directed to Tony Lopez/tonylopez@stocktonusd.net, and must be submitted in writing on or by 2:00 P.M. ON Tuesday, February 20, 2024. Pursuant to Public Contract Code section 20111.6, each prospective MEP Contractor holding C-4, C-7, C-10, C-16, C-20, C-34, C-36, C38, C-42, C-43, and/or C-46 licenses shall be prequalified by the District to perform construction work as a first tier subcontractor on the Project. Respondents shall consider and address the materials and information distributed at the meeting in their RFQ/P Packets. Respondents that fail to attend the mandatory informational meeting, in its entirety, shall be ineligible for responding to this RFQ/P. Although the final scope of work will be negotiated in the executed Agreement (defined below at subparagraph F), the selected developer shall be responsible for performing the following scope of work, at a minimum: Preconstruction Services: 1. Review design and support documentation for content, constructability, completeness, scheduling, clarity, consistency, and coordination. 2. Undertake value-engineering analysis and prepare reports with recommendations to District and Architect of Record to maintain established program budget and specifications. 3. Provide detailed cost estimates. 4. Expedite design reviews, including modifications, if any, based on value analysis. 5. Provide a proposed Guaranteed Maximum Price (GMP) for the construction of the project with identified subcontractor bids and self-performed work. Construction Services: 1. Construction of the Project. 2. Coordination of record drawings and specifications. 3. Compilation of operations and maintenance manuals, warranties/guarantees, and certificates. 4. Obtaining occupancy permits and coordinating testing, documentation, and governmental inspections and approvals. 5. Preparation of accounting and closeout reports and occupancy plan reports. 6. Other responsibilities as necessary for the completion of the program. February 20, 2024 at 2 P.M. Last day to receive written questions from Respondents. Week of March 4, 2024: Release of shortlist qualified Respondents and interview notifications. Week of March 11, 2024 :Interviews of qualified Respondents. Week of March 11, 2024: Notice to selected developer to commence contract negotiation. March 25, 2024: Board Approval The Request for Qualifications and Proposals ("RFQ/P"), which includes instructions for its completion, is enclosed for your consideration. Respondents to this RFQ/P shall submit a completed Statement of Qualifications ("SOQ") along with the Proposal (collectively "RFQ/P Packet"). This Project is subject to labor compliance monitoring and enforcement of compliance with prevailing wage requirements by the Department of Industrial Relations pursuant to Labor Code section 1771.4. Contractors of all tiers must be currently registered and qualified to perform public work pursuant to Labor Code section 1725.5. All Respondents must be prequalified by the District in accordance with Public Contract Code section 20111.6. First tier electrical, mechanical and plumbing subcontractors are required by Public Contract Code section 20111.6 and must be prequalified prior to the time subcontractor bids are submitted. To comply with the skilled and trained workforce requirement pursuant to Public Contract Code section 2600, all contractors must agree to be bound by the Districts Project Labor Agreement. Developer shall comply with all applicable federal, state and local laws regarding COVID-19, including Vaccination and Testing Certification Requirements. If the District issues addenda to this RFQ/P, Contractors are solely responsible for and must acknowledge receipt of addenda in the Contractors SOQ. Failure to acknowledge and respond to any addenda issued by the District may, in the District's sole discretion, render the Respondents SOQ to be deemed nonresponsive and may be rejected. Each submittal must conform and be responsive to the requirements set forth in this RFQ/P. The District reserves the right to waive any informalities or irregularities in the RFQ/P Packets. The District also reserves the right to reject any and all RFQ/P Packets and to negotiate contract terms with one or more Respondents. The District retains the sole discretion to determine issues of compliance and to determine whether a program management respondent is responsive, responsible, and qualified. The District hereby notifies all Respondents that it will affirmatively insure that, in any contract entered into pursuant to this advertisement, no respondent will be discriminated against on the grounds of race, color, sex, age, ancestry, religion, marital status, national origin, medical condition or physical disability on consideration for the award.

Post-Bid

Educational

$2,348,039.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
174
Active Projects
92
Bidding Soon
1,916
All Active Projects
800
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2024

May 3, 2024

img_map_placeholder

Multiple Locations, Stockton, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.