Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Charlotte, North Carolina. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Per Addendum 3- Project was Rebid Cell Lot Auxiliary Lane project will provide an additional lane for Cell Phone Lot #1 on Josh Birmingham Parkway. This project includes construction of a modular precast block wall, traffic control, erosion and sedimentation control, grading, drainage, construction of curb and gutter, landscaping, relocation of light and banner poles, asphalt paving, fencing, and signage. The deadline for submitting written requests for clarification is on Friday, September 13, 2024, at 5:00 PM EST. Each Bid shall be accompanied by a Bid security in the form of, at Bidder's option, cashier's check, certified check, money order or bid bond (in favor of the Owner) in the amount of 5% of the Base Bid amount Payment Bond. The approved form of security furnished by the Contractor and its surety as a guaranty that it will pay in full all bills and accounts for materials and labor used in the construction of the Work. Performance Bond. The approved form of security furnished by the Contractor and his surety as aguarantee that the Contractor will complete the Work in accordance with the terms of the Contract. Small Business Enterprise (SBE) means a business which (a) is at least fifty-one percent (51%) owned by one or more persons (b) the owner has a personal net worth less than 750,000 a year; (c) is located within the metropolitan statistical area and finally (d) has been in business a minimum of 1 year. The contractor shall achieve Substantial Completion of the Work within 125 calendar days from the date of commencement stated in the written Notice to Proceed. Contractor acknowledges that this time for completion of the Work is sufficient for it to perform all the Work. Contractor shall then achieve Final Completion and Acceptance of the Work, including all required final submittals, not later than 30 calendar days from the date of Substantial Completion. Contractor shall notify the Owner in writing at least 72 hours in advance of the time actual construction operations will begin. The City, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that for any contract entered into pursuant to this Invitation to Bid, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. No Site Tour will be scheduled. Bidders may elect to visit areas accessible to the public at their convenience. It is the intent of the Owner to award a Contract to the lowest responsive and responsible Bidder, provided the Bid has been submitted in accordance with the requirements of the Bidding Documents and does not exceed the funds available. The Owner shall have the right to waive abnormalities and irregularities in a Bid received and to accept the Bid which, in the Owner's judgment, is in the Owner's best interests. The Owner reserves the right to reject any and or all Bids. Questions regarding the City's CBI Program should be directed to: Claire Butler, Airport Business Diversity and Development Manager P.O. Box 19066 Charlotte, NC 28219 Telephone: (980) 240-3844 Email: claire.butler@cltairport.com Small Business Enterprise ("SBE") Goal 0.00% Minority Business Enterprise ("MBE") Goal 0.00% Woman Business Enterprise ("WBE") Goal 0.00% Minority/Woman Business Enterprise ("MWBE") Goal 10.00%
Post-Bid
Roads / Highways
$500,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 11, 2024
April 10, 2024
Josh Birmingham Pkwy, Charlotte, NC
Related To This Project
Charlotte, NC
Bid Date: Feb 16 2024
Charlotte, NC
Bid Date: Mar 01 2024
Charlotte, NC
Bid Date: Feb 28 2024
Charlotte, NC
Bid Date: Feb 20 2024
Charlotte, NC
Bid Date: Mar 12 2024
Charlotte, NC
--
Charlotte, NC
Bid Date: Mar 05 2024
Charlotte, NC
Bid Date: Feb 20 2024
Charlotte, NC
Bid Date: Mar 08 2024
Charlotte, NC
Bid Date: Feb 15 2024
Charlotte, NC
Bid Date: Feb 15 2024
Charlotte, NC
Bid Date: Feb 25 2021
Charlotte, NC
Bid Date: Jul 31 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.