Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a sidewalk / parking lot in Wilmette, Illinois. Conceptual plans call for site work for a sidewalk / parking lot.
This project includes complete demolition and reconstruction of the fountain that is a focal point and gathering place on the Village Green at Village Hall. The fountain was constructed circa 1972 for the Village's centennial celebration. Over the years, the Village has made investments to keep the fountain operational; however, there are critical fountain components inherent to its construction design that can no longer be rehabilitated, such as the filtration system and water leaks in its subsurface concrete foundation and piping (inaccessible), which can only be addressed through complete demolition and new construction. The final construction estimate depends on the final design of the new fountain (e.g., size, form, function, and finish materials used to achieve desired aesthetics, decorative lighting, and technology offerings implemented). The estimated cost of the fountain is $350,000. The project also includes completing the Village Green Streetscape enhancements that were deferred in 2019 when the Central Avenue and Downtown Streetscape project was approved. These improvements include expanded concrete paving around the fountain, the Village Hall entrance, and the holiday tree as well as seatwalls, planters, and landscaping. The estimated cost of the additional streetscape enhancements is $600,000. This project is included in the city’s 2024-2033 Capital Improvement Program (CIP). As of March 7, 2024, per owner designs and construction are tentatively scheduled for 2025 or later. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Sidewalks / Parking Lot
$950,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 30, 2025
To Be Determined, Wilmette, IL
Related To This Project
Wilmette, IL
--
Wilmette, IL
--
Wilmette, IL
--
Wilmette, IL
--
Wilmette, IL
--
Wilmette, IL
--
Wilmette, IL
--
Wilmette, IL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.