Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Four Oaks, North Carolina. Completed plans call for the renovation of a educational facility.
Air Handler replacement project at Four Oaks Elementary School The Owner reserves the unqualified right to reject any or all proposals. Direct questions to in writing to Ms. Lauren Beverly, email; LBeverly@CPLteam.com. All written questions will be received by CPL no later than 3:00 pm February 20th, 2024 . Division of the Specification into sections is for the purpose of simplification alone. Responsibility for the work of various trades shall rest with the Contractor. Various sections of this Division are related to each other as well as the mechanical drawings. Examine all drawings and read all applicable parts of the project manual in order to insure complete execution of all work in this Division, coordinating where required with other trades in order to avoid conflicts. B. All control work is included as the responsibility of this Division. Control system requirements and control system components described in various sections are required to be coordinated and provided by the Contractor. C. These specifications and accompanying drawings are intended to cover the furnishing of all labor, materials, equipment and services necessary for the complete installation and acceptable performance of the mechanical systems. Small items of material, equipment and appurtenances not mentioned in detail or shown on the drawings, but necessary for complete and operating systems shall be provided by this contractor without additional charge to the Owner and shall be included under this contract. D. In general, specifications establish the quality of material, equipment and workmanship. The contract documents are intended to secure for the Owner, a first-class installation in every respect. Labor shall be performed by skilled mechanics, and the entire facility, when delivered to the Owner, shall be ready for satisfactory and efficient operation. E. The Contractor shall carefully examine the drawings and specifications before accepting the contract. He shall call attention to any changes or additions which, in his opinion, are necessary to make possible the fulfillment of any guarantee called for by these specifications; failing which, it shall be deemed that he has accepted full responsibility for all such guarantees. F. The contractor shall put his work in place as fast as is reasonably possible. He shall, at all times, keep a competent foreman in charge of the work, to make decisions necessary for the diligent advancement of the work. The Contractor shall facilitate the inspection of the work by the Owner's Representative. G. The Contractor shall coordinate all work in the building in order to facilitate intelligent execution of the work. He shall also remove any rubbish as expeditiously as possible. H. Materials or products specified herein and/or indicated on the drawings by trades names, manufacturer's names, model number or catalog numbers establish the quality of materials or products to be furnished. Model numbers are to be confirmed by the manufacturer to provide required capacities and material to meet the specifications and design intent. In no instance shall an obsolete, incomplete or inaccurate trade name, manufacturer name, model numbe
Post-Bid
Educational
$2,000,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 27, 2024
April 15, 2024
180 W Hatcher St, Four Oaks, NC
Related To This Project
Four Oaks, NC
Bid Date: Jun 12 2024
Thin Lift Asphalt Pavement Preservation Work - Various Secondary Routes in Johnston County - 4197605
Four Oaks, NC
Bid Date: Dec 08 2020
Four Oaks, NC
Bid Date: Oct 18 2024
Four Oaks, NC
Bid Date: Jun 08 2021
Four Oaks, NC
Bid Date: Feb 20 2024
Four Oaks, NC
--
Four Oaks, NC
Bid Date: Mar 26 2024
Four Oaks, NC
--
Four Oaks, NC
--
Four Oaks, NC
Bid Date: Feb 23 2022
Four Oaks, NC
Bid Date: Dec 14 2021
Four Oaks, NC
Bid Date: Dec 14 2021
Four Oaks, NC
Bid Date: Sep 07 2023
Four Oaks, NC
Bid Date: Aug 10 2021
Four Oaks, NC
Bid Date: Mar 21 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.