BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 4, 2024 at 7:00 PM

Updated March 5, 2024

Site work and paving for a mixed-use development in Burton, Michigan. Completed plans call for site work for a road / highway; and for paving for a road / highway.

1.00 mi of hot mix asphalt cold milling and resurfacing, concrete curb, gutter, sidewalk and ramps and pavement markings on Bristol Road from Saginaw Street to Dort Highway (M-54) in the city of Burton, Genesee County. This is a Local Agency project. Net classification required for this project is 1809 Cb In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of Ea. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder. Control Sec Job No Federal No ST 25000 216167A 24A0252 MI DOT - 2403 028 - Hot Mix Asphalt Cold Milling and Resurfacing, Concrete Curb, Gutter, Sidewalk and Ramps and Pavement Markings on Bristol Road The Contractor shall prepare and submit a complete, detailed, signed Progress Schedule to the Engineer. The Project Supervisor for this project is as follows: Peter Wingblad City of Burton 4093 Manor Drive Burton, MI 48519 Telephone: (810) 742-9230, ext 3106, e-mail: p.wingblad@burtonmi.gov

Bid Results

Roads / Highways

$1,550,428.00

Public - State/Provincial

Paving, Site Work

28

5

9

6

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
317
Active Projects
170
Bidding Soon
2,352
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2024

April 15, 2024

Project location map

Bristol Rd, Burton, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.